Enrange Flex M Pre-Engineered Modular Receiver Manual
October 2014
Page 5 of 31
operate a crane, hoist or lifting device if the chain or wire rope is not seated properly in the
sprockets, drum or sheave
operate any damaged or malfunctioning crane, hoist, lifting device or other material handling
equipment
change any settings or controls without authorization and proper training
remove or obscure any warning or safety labels or tags
leave any load unattended while lifted
leave power on the radio controlled equipment when the equipment is not in operation
operate any material handling equipment using a damaged controller because the unit may be
unsafe
operate manual motions with other than manual power
operate radio controlled equipment when low battery indicator is on
WARNING
THE OPERATOR SHOULD NOT ATTEMPT TO REPAIR ANY RADIO CONTROLLER. IF ANY PRODUCT
PERFORMANCE OR SAFETY CONCERNS ARE OBSERVED, THE EQUIPMENT SHOULD
IMMEDIATELY BE TAKEN OUT OF SERVICE AND BE REPORTED TO THE SUPERVISOR. DAMAGED
AND INOPERABLE RADIO CONTROLLER EQUIPMENT SHOULD BE RETURNED TO MAGNETEK FOR
EVALUATION AND REPAIR. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS
INJURY OR DEATH AND DAMAGE TO EQUIPMENT.
1.4 PRE-OPERATION TEST
At the start of each work shift, or when a new operator takes control of the crane, operators should do, as a
minimum, the following steps before making lifts with any crane or hoist:
Test all warning devices.
Test all direction and speed controls.
Test the receiver emergency stop.
Summary of Contents for FLEX M Series
Page 21: ...Enrange Flex M Pre Engineered Modular Receiver Manual October 2014 Page 18 of 31...
Page 22: ...Enrange Flex M Pre Engineered Modular Receiver Manual October 2014 Page 19 of 31...
Page 23: ...Enrange Flex M Pre Engineered Modular Receiver Manual October 2014 Page 20 of 31...
Page 28: ...Enrange Flex M Pre Engineered Modular Receiver Manual October 2014 Page 25 of 31...
Page 29: ...Enrange Flex M Pre Engineered Modular Receiver Manual October 2014 Page 26 of 31...