
18
6.0 INSTALLATION
(Refer to Hook-Up Schematic in Section 17)
Installation of the welding system consists of locating and interconnecting the various
system components such as the welding power supply, water circulator, controller,
shield gas, work cable, weld Head and extension cables (if any).
6.1
Locate the welding power supply in the work area. Take into consideration the
torch cable length and extension cables (if any), as well as cable wrap around
the work piece.
6.2
Install and connect electrical service to the MPS-4000 Power Supply, and Model
712 according to the instructions in the separate manual provided.
6.3
For the head-mounted wire feed model, connect the torch cable to the power
source (and water/gas connections to the Controller and water cooler). For
WFOF and WFPP versions, the torch cable connects directly to the wire feeder
central connector.
6.4
Connect the Control Cable for the weld Head to the rear of the Model 712
Controller. (NOTE: This control cable is inside the Torch Cable umbilical.)
6.5
Connect the work cable (ground clamp) to the work piece.
Summary of Contents for 609AF0A0C0
Page 12: ...9...
Page 13: ...10...
Page 27: ...24...
Page 34: ...31...
Page 40: ...37 Undercutting 1 Reduce power 2 Reduce welding speed 3 Shorten arc length...
Page 43: ...40 Remote Pendant...
Page 46: ...43 14 0 ELECTRODE EXTENSION OFTEN NEGLECTED WHEN USING SELF SHIELDED CORED WIRES...
Page 47: ...44...
Page 48: ...45...
Page 49: ...46 15 0 PREVENTING THE EFFECTS OF MOISTURE CONTAMINATION OF FLUX CORE WIRE...
Page 50: ...47...