
337
8. Set the Fly-jib stowage bracket B (22) on the mounting position of the main boom (1) and lightly tighten
it with 4 mounting bolts (56).
9. Connect the wiring connector (55) of the Fly-jib stowage detection limit switch at the side of the Fly-jib
stowage bracket B (22).
10. Set the Fly-jib stowage bracket A (21) on the mounting position of the main boom (1) and lightly tighten
it with 4 mounting bolts (54).
11. Tighten the adjusting bolt (52), with the nut (53) attached, of the Fly-jib stowage bracket A (21) until it
contacts the stopper.
NOTES
Keep the nut (53) tightened lightly when installing the Fly-jib because positioning is adjusted.
12. Lift the No. 1 Fly-jib (2) by operating the crane and bring it
close to the bracket (26) of the main boom tip.
Summary of Contents for CC1485S-1
Page 2: ......
Page 57: ...49 SAFETY LABEL LOCATIONS OUTSIDE OF THE CABIN...
Page 58: ...50 SAFETY LABEL LOCATIONS IN THE ENGINE ROOM...
Page 59: ...51 1 Safe operation 557 3494500 2 Working range diagram 585 2236900...
Page 82: ...74...
Page 232: ...224 This Page Intentionally Left Blank...
Page 267: ...259...
Page 302: ...294 This Page Intentionally Left Blank...
Page 305: ...297 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 309: ...301 4 WORKING RADIUS LIFTING HEIGHT...
Page 310: ...302 This Page Intentionally Left Blank...
Page 363: ...355 9 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 366: ...358 9 4 2 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 40 DEGREES AND 60 DEGREES...
Page 368: ......
Page 369: ......
Page 370: ......