
290
5. Attach protective wire ropes (22) to both the
overwinding prevention device (9) and the bar (15).
Set the protective wire rope (22) sandwiched between
two washers (19) to the bolt (18) inserted into the
overwinding prevention device (9) or bar (15), then
secure with the nut (20), followed by the U nut (21).
NOTES
・
Attach the protective wire ropes (22) so that they are
positioned on the inside of the overwinding prevention
device (9) and bar (15).
・
Leave gaps of approximately 2 mm on either side of the
protective wire rope (22) between the washers (19) so that
it can move smoothly.
6. Use the shackles (14) to attach the overwinding
prevention device weight (13) to the two protective
wire ropes (22).
NOTES
・
Attach the overwinding prevention device weight (13) so
that the hole through which the wire rope will be
inserted is positioned at (a).
・
Reuse one of the shackles (14) from the detached
2-fall/4-fall hook block.
7. Pass the wire rope over the load sheave at the end of
the boom as shown in the diagram on the right.
8. Pass the end of the wire rope (12) through the round
hole in the overwinding prevention device weight (13).
Summary of Contents for CC1485S-1
Page 2: ......
Page 57: ...49 SAFETY LABEL LOCATIONS OUTSIDE OF THE CABIN...
Page 58: ...50 SAFETY LABEL LOCATIONS IN THE ENGINE ROOM...
Page 59: ...51 1 Safe operation 557 3494500 2 Working range diagram 585 2236900...
Page 82: ...74...
Page 232: ...224 This Page Intentionally Left Blank...
Page 267: ...259...
Page 302: ...294 This Page Intentionally Left Blank...
Page 305: ...297 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 309: ...301 4 WORKING RADIUS LIFTING HEIGHT...
Page 310: ...302 This Page Intentionally Left Blank...
Page 363: ...355 9 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 366: ...358 9 4 2 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 40 DEGREES AND 60 DEGREES...
Page 368: ......
Page 369: ......
Page 370: ......