background image

15

14

Manual

Manual

Assembly stages

Fig. 7

Fig. 11

attaching point of the central runner

Fig. 12

Fig. 9

Fig. 6 

Fig. 10

Fig. 8

Б

Б

Б

Б

Б

В

В

А

А

А

А

А

А

А

Г

Г

Д

Д

4ВК

4НК

4НК

2-1к

4ВО

4ВО

2

2

4ВО

2

2

Б

4ВК

         Location of runners and arcs of the frame of the greenhouse 

with extending inserts

one “Insert-Eco”  extends 
the greenhouse by 2.08 m 

                        two “Insert-Eco” extend

                                                   the greenhouse by 4.16 m

 one “Insert-Eco” extends 
the greenhouse by 2.08 m 

 two “Insert-Eco” extend  
the greenhouse by 
4.16m 

4НС

4ВО

4ВО

OR

OR

4НС

4ВО

4НС

4НС

4НС

4НС

4ВО

4ВО

4ВО

4ВО

4ВО

Units view

, when 

assembling  

runner

s

Summary of Contents for Classic

Page 1: ...ENHOUSE DACHNAYA 2 DUM honeycomb polycarbonate greenhouse Technical certificate Assembling manual p 2 6 p 7 22 ength 4 04 m 6 12 m 8 2 m width 3 07 m height 2 QUALITY STANDARD DURABILITY design 2013 I...

Page 2: ...2 end side brace 2 12 end small window vertical element 2 12 end small window vertical element 2 12 door vertical element 2 12 door vertical element 2 13 door and end small window horizontal element 1...

Page 3: ...are presented in Table 4 1 2 Operating Rules marking name quantity pcs 4 package door and small window hinge 8 door and small window hook 4 bracket for the hook 8 screw 4 8 530 screw 4 14 40 screw 4...

Page 4: ...chairs at intermediate stages of assemblage for uniform lift of the assembled frame For the hole aligning use a nail of 4 mm in diameter or a drift pin with a tapered end 1 2 3 4 5 Some parts have fr...

Page 5: ...2 1 21 10 11 2 9 1 4 1 8 8 10 9 2 4 2 3 1 4 General view of Dachnaya Eco 4 greenhouse frame parts 4 and 2 ref Fig 5 6 parts 12 14 a door and a small window ref Fig 13 14 2 1 3 8 1 10 9 1 9 2 21 13 14...

Page 6: ...ound Again check the equality of the diagonals using a cord and level position of angles of the frame Manual Fig 3 Cutting list of honeycombpolycarbonate Left end side Left end side Right end side Rig...

Page 7: ...ya Eco 4 greenhouse parts are shown schematically Units view when assembling runners Units view when assembling runners 1 4 1 1 1 1 1 2 9 1 21 4 9 2 Cutting list of covering of an end Right end side L...

Page 8: ...ocation of runners and arcs of the frame of the greenhouse with extending inserts one Insert Eco extends the greenhouse by 2 08 m two Insert Eco extend the greenhouse by 4 16 m one Insert Eco extends...

Page 9: ...l window inside view Fig 14 Door outside view 12 12 12 12 14 14 14 14 14 14 14 14 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 12 12 12 12 12 12 12 12 12 12 12 12 Fig 15 Fig 16 Fig 17 Covering layer E...

Page 10: ...htening nuts a screw would pull the edge of a panel down In order to do that while drilling sheets through a hole in the element 1 set a bore to the angle of 300 to the horizontal Start fastening of c...

Page 11: ...9 3 9 4 washer hinge element 12 Fig 27 screw 4 14 screw 4 25 element 10 screw 4 14 screw 4 40 screw 4 35 screw 4 35 screw 4 35 screw 4 35 screw 4 40 screw 4 35 5 package sealing profile consist of a d...

Page 12: ...ents 2pcs Installation diagram of arc reinforcing elements Arc reinforcing elements are installed with regular intervals along the length of the greenhouse Arc reinforcing elements consist of a top ho...

Page 13: ...ot be reproduced in any form in whole or in part without written permission of Volya Company EN Manufacturer Volya LLC Dubna Moscow region phone fax 8 495 598 5 999 www perchina ru www domflora ru e m...

Reviews: