2  Installation

2.1  Receipt of the product

10x

–  Seal + gasket kit + coloured indicator

–  Fittings kit (optional)

WARNING!

The instruction manual is an inte-

gral part of the device and should 

therefore be read and stored 

carefully.

PROHIBITED

Packaging material must be prop-

erly disposed of and kept out of 

children’s reach as it may repre-

sent a hazard. Disposal must be 

performed in line with applicable 

laws.

2.2  Assembly

Authorised personnel: specialised installer 

or plumber, assigned by the metering oper-

ator.

WARNING!

Only authorised and suitably 

trained personnel with sufficient 

technical experience may install 

and operate the device.

Before installing the device, make sure that 

the two sections of tube are even to prevent 

mechanical stress, clean them with care (es-

pecially in the case of empty tubes) and let 

water run for a while, using a stub pipe on 

the tube instead of the meter.

 

If there is no water in the pipeline, open the 

valve upstream of the device before install-

ing it. This is necessary because opening 

the valve after installation is complete may 

cause air suction that could damage the de-

vice.

 

Before using the meter, first fully remove air 

from the pipe and the device itself. The in-

terception/adjustment valves must be fully 

open when doing this. Open the valve at the 

start first and then the valve at the end.

 

When replacing the meter, it is recommend-

ed to replace the gasket on the fitting. Rec-

ommended gasket hardness: minimum 80 

Shore A.

 

Tighten the nut with a torque wrench and 

use a counter wrench to hold the meter in 

position. Maximum tightening torque: 40 

Nm.

Summary of Contents for ElecTo SJ

Page 1: ...IONS FOR INSTALLATION USE AND MAINTENANCE ElecTo SJ Translation of the original instructions Before installing and using the device carefully read this manual and store it together with the product El...

Page 2: ...onsibili ty with immediate invalidation of the war ranty in relation to Damage or defects caused by transport or loading unloading Incorrect installation caused by a failure to observe the instruction...

Page 3: ...dered contact the local distributor who sold you the device The device must be installed and used in an area protected from freezing The device must always be pro tected from extreme humidity and heat...

Page 4: ...ith mechan ical movement and fully electronic timing devices designed for measuring hot and cold water in residential applications ElecTo SJ measures the flow of water using a turbine and a magnetic d...

Page 5: ...of use see Technical specifications 1 5 Structure 1 2 3 4 1 Timing device 2 Display 3 Meter housing 4 Coloured water temperature indicator optional 1 5 1 Dimensions H B h L DN 15 20 inches 1 2 3 4 Thr...

Page 6: ...in fixed mode with the fol lowing automatic display cycle for 60 seconds the Main view for 12 seconds the Periodic readings for a further 12 seconds the Display Test and firmware version Icon Descrip...

Page 7: ...2 September 2021 Billing value 2 displays the volume re corded on the billing date for 3 seconds Billing date 1 is set by default to 31 12 each year Billing date 2 is set by default to the end of eac...

Page 8: ...conditions U0 D0 Protection class IP68 Power supply Lithium battery 3 6 VDC 1g capacity varies based on type V Useful battery life 7 13 default or 15 years Environmental class O Electromagnetic class...

Page 9: ...0 Additional technical specifications 1 10 1 Pressure drop 0 01 0 10 1 00 0 1 1 0 10 0 Pressure loss bar Pressure loss Model SJ DN15 DN20 p 0 63 0 01 0 0 1 0 1 1 0 Flowrate m3 h 1 10 2 Typical error c...

Page 10: ...tions Approvals CE in compliance with European standards RED 2014 53 EU 2011 65 UE and subsequent revisions RoHS Data sent Meter serial number total volume instant flow date alarms Configuration By ra...

Page 11: ...ections of tube are even to prevent mechanical stress clean them with care es pecially in the case of empty tubes and let water run for a while using a stub pipe on the tube instead of the meter If th...

Page 12: ...eter to permit main tenance operations and inspections on the device as well as to check the system The installation of a non return valve inside or outside the meter is also recommended see dedicated...

Page 13: ...eter refer to letters U and D on the dial If the letters U and or D are followed by the letter S install a flow straightener Allowable water pressure ISO 4064 1 The maximum allowable pressure MAP is 1...

Page 14: ...ivated after the passage of 10 litres of water Programming mode is activated by tapping the magnetic key symbol with the magnetic key The cumulative time for this mode is 120 minutes The radio setting...

Page 15: ...erating Temperature 0400 Low Battery Voltage 1000 Metrological verification period expired 4000 Metrological Wrong Checksum Example of simultaneous errors Low battery voltage Metrological verifica tio...

Page 16: ...n and periodic checks should be performed to ensure the required environmental conditions are met d PROHIBITED It is forbidden to use abrasive products methyl alcohol hy drochloric acid 35 sodium bica...

Page 17: ...normativa dell Unione The object of the declaration described above is in conformity with the relevant Union legislation 2014 32 EU 201 4 53 EU EU 2017 2102 Direttiva dispositivi di regolazione e mis...

Page 18: ...8 at na mminr ratore egato Le ale qs Jh r President e President and EO Attivit Certificato nr Activity Certificate no Certificato di esame UE del tipo in accordo al Modulo B della Direttiva 2014 32 U...

Page 19: ...19 NOTES...

Page 20: ...right to change its products at any time and without prior notice with the aim of improving them and without compromising primary features All the graphic illustrations and or photographs appearing i...

Reviews: