EN
35
l
WARNING!
Sensitivity class in installation conditions: H U3-D0, V U10-D5
For horizontal installations upstream, it is necessary to have a linear section that
is at least 3 times the diameter of the meter (H U3), while downstream it is irrel-
evant (D0).
For vertical installations upstream, it is necessary to have a linear section that is
at least 10 times the diameter of the meter (V U10), while downstream it must be
5 times the diameter (D5).
If the U and/or D letters are followed by the letter S, install a flow straightener.
H U3-D0
U3 = 50 mm x 3
= 150 mm
U10 = 50 mm x 10
= 500 mm
D5 = 50 mm x 5
= 250 mm
D0 = 0
DN50
DN50
150 mm
500 mm
250 mm
V U10-D5
Summary of Contents for ElecTo Bulk
Page 19: ...IT 19 5 Certificati ed omologazioni...
Page 20: ...IT 20...
Page 38: ...EN 38 5 Certified and approved...
Page 39: ...EN 39...
Page 57: ...DE 57 5 Zertifikate und Zulassungen...
Page 58: ...DE 58...
Page 76: ...FR 76 5 Certificats et homologations...
Page 77: ...FR 77...
Page 95: ...ES 95 5 Certificaciones y homologaciones...
Page 96: ...ES 96...
Page 97: ...97...