background image

TECHNICAL DETAILS

SAFETY PRECAUTIONS

1. During Diesel delivery always wear oil resistant and always wash hands with water and soap at 

the end. Always clean at once fuel stains to avoid slips and/or pollution.

2. Use particular care with the zones next to the controls.

3. When cleaning, and specially when removing dust or waste, always wear suitable clothes, if 

possible use aspirators only. Always use suitable clothes or protective devices. Never place 

hands or limbs under moving parts.

SYSTEM DESCRIPTION

Functional Description

The diesel transfer system are hydraulic machine tools which feed with a given capacity (volume) 

of fluid in the time unit, a collecting tank, sucking the liquid from an open surface feed tank; the 

allowed suction lift (geodetic suction lift Hga) is also a specific characteristic of the pump. The 

system is composed by complementary equipment, operating as whole to give a complete 

service:

1. Diesel pump

2. Manual dispensing nozzle

3. 2M suction hose with filter

4. 4M delivery hose

MACHINE DESCRIPTION

The wall mounted pump kit has been designed and built according to the following standards:

1. Electric requirements: EN 60204-1 and EN 60529

2. Mechanical requirements: EN 292-1 and EN 292-2; EN 55081-2, EN 55011C/A

3. Other requirements 89/392 CEE

ALLOWED AND FORBIDDEN USE

1. Diesel transfer unit has been designed and built for DIESEL TRANSFER ONLY from reservoirs, 

tanks and drums.

2. It is strictly forbidden to employ it to transfer liquids of different kind as gasoline, explosives and 

corrosives (or flammable), alimentary liquids.

3. The machine isn’t designed for employment in the explosive environment.

4. Operating the pump is forbidden to children and disabled person.

5. It is forbidden to employ the unit next to flammable liquids (gasoline, alcohol, etc.).

6. It is forbidden the employment in closed environments in presence of gasoline, LPG, methane 

fuelled vehicles.

TRANSPORT AND UNPACKING

Due to its weight and dimensions, the unit can easily be transported by hand. Control that the 

package is good conditions and verify that the unit isn’t damaged. Each failure must be noticed in 

10 days from receiving the machine.

For correct unpacking carefully follow these instructions:

1. Place the case on the ground following the indications on the package.

2. Carefully open the case, remove the machine and place it on the ground or on a steady 

surface.

3. Control that the machine and its accessories aren’t damaged.

Item No.

 FTWM120-001

Current

AC

Voltage

120V

Power

1100W

Electrical Power

15111200

120LPM/32GPM

Flow Rate

Model of Meter

E3

Summary of Contents for FTWM120-001

Page 1: ...fore operating Failure to follow the safety rules and other basic safety precautions may result in serious personal injury Save these instructions in a safe place and on hand so that they can be read...

Page 2: ...ere are certain applications for which this equipment was designed It will do the job better and more safely at the capacity for which it was intended Do not modify this equipment and do not use this...

Page 3: ...014 1 00 A1 99 A2 99 limits and methods for measuring radio disturbance characteris tics EN55014 2 97 Electrical motor operated and thermal appliances for household and similar purposes electric tools...

Page 4: ...extinguishers placed next to the machine Combustion of paints and plastic parts may produce toxic emissions use the normal precautions to be employed in case of fire always refer to the security super...

Page 5: ...requirements EN 292 1 and EN 292 2 EN 55081 2 EN 55011C A 3 Other requirements 89 392 CEE ALLOWED AND FORBIDDEN USE 1 Diesel transfer unit has been designed and built for DIESEL TRANSFER ONLY from re...

Page 6: ...The meter used in the pumping unit is calibrated at the factory Calibration is recommended upon initial use after disassembly or significant wear Meter calibration can be easily changed with the proc...

Page 7: ...iability is limited to replacement or repair of defective material within the warranty period when returned freight prepaid to the distributor or their designated service depot 3 The warranty does not...

Page 8: ...Description Latex Washer Nut Bolt M12 Gun base Board Meter Q ty 4 4 1 1 1 1 Part No 11 12 13 14 15 16 Description Hose Connectors Pump Inlet Outlet Nozzle Bolt Q ty 1 1 1 1 1 4 Wearing parts EXPLODED...

Page 9: ...for continuous use under maximum back pressure Functioning under by pass conditions is only allowed for brief periods of time 2 3min utes maximum FLUIDS PERMITTED FLUIDS NOT PERMITTED PERMITTED 1 DIE...

Page 10: ...IMENSIONS for their position and dimen sion THE MOTORS ARE NOT OF AN ANTI EXPLOSIVE TYPE Do not install them where inflammable vapours can be present 4 CONNECTING THE TUBING Before connection make sur...

Page 11: ...quently always start up immediately 4 When the system is functioning the pump can work with pressure at the inlet as high as 0 5 bar beyond which cavitation phenomena can begin with a consequent loss...

Page 12: ...the suction filter is not clogged That the suction height does not exceed 2m if the height exceeds 2m fill the suction hose with fluid That the delivery tube is allowing the evacuation of the air When...

Page 13: ...Problems Low voltage in the electric power line Low level in the suction tank Foot valve blocked Filter clogged Excessive suction pressure High loss of head in the delivery circuit working with the b...

Page 14: ...BY PASS SPRING BY PASS VALVE SCREW M6 SCREW M6 PUMP BODY O RING ROTOR BLADE Q ty 1 1 1 1 4 1 1 1 1 5 Part No 11 12 13 14 15 16 17 18 19 20 Description SCREW M5 PIN 5 PUMP COVER KEY TERMINAL BOARD DOUB...

Page 15: ...ce at all times INSTALLATION 1 The meter can be installed in any position directly on rigid pipelines or flexible hoses or directly on pumps or tanks 2 The meter flow direction is fixed and indicated...

Page 16: ...perly fix the plug 26 with the sealing gasket 25 USE After installation and calibration the meter is ready to work Turn the reset knob 2 clockwise if it is mounted on the left of the meter and counter...

Page 17: ...ssembled chamber 2 Install the gaskets 16 17 properly after inspecting and lubricating them with grease 3 Make sure that when reattaching the cover to the body of the meter the nutating disk needle do...

Page 18: ...8 19 20 21 22 23 24 25 26 27 28 Description Meter body O ring 110 72x3 53 O ring 23 47x2 62 Measuring chamber Measuring tray Measuring chamber Cylinder spring Screws 4x20 O ring 4 47x1 78 By pass adju...

Page 19: ......

Page 20: ...Size 145x210mm REV 03 11 22 2 09 05 30 1087 157 Macnaught Americas 813 628 5506 info macnaughtusa com Read Manual Before Use...

Reviews: