214367
6
Revision A
1009204
Figure 2.3: Moving Header with Forklift
4.
Back up until the unit clears trailer, and slowly lower to
150 mm (6 in.) from the ground.
5.
Take to storage or setup area.
6.
Set machine down on secure, level ground.
7.
If hydraulic motor and hoses are shipped separately on
pallet, unload pallet.
8.
Check for shipping damage and missing parts.