
214327
115
Revision B
1003806
A
B
C
Figure 4.6: Reel Hydraulics Receptacle
11. Open the cover on header receptacle (A).
12. Push in lock button (B) and pull handle (C) to the half-open
position.
1003804
A
B
C
Figure 4.7: Reel Hose Connection
13. Remove the hose bundle with multicoupler (C) from the
windrower, place the multicoupler onto the header
receptacle, and push handle (B) to engage the
connector pins.
14. Push the handle away from the hoses until lock button (A)
snaps out.
15. Raise and lower the header and the reel a few times to
allow trapped air to pass back to the reservoir.
Summary of Contents for D65
Page 3: ...Declaration of Conformity 1022881 214327 i Revision B ...
Page 4: ...1022882 214327 ii Revision B ...
Page 12: ......
Page 20: ......
Page 42: ......
Page 50: ......
Page 115: ...214327 95 Revision B 1001652 A B C Figure 3 83 Beater Bars OPERATION ...
Page 138: ......
Page 262: ......
Page 276: ......
Page 308: ......