7.
40–45 Foot Headers:
With the sling attached to the
lifting device and supporting the hose management
arm, cut and remove the wire (A) that secures the hose
management arm to channel latch on top of header
frame tube.
Figure 3.5: Hose Management Arm
Shipping Wire
8. With the help of the sling and lifting device, position the
hose management arm (A) as shown.
Figure 3.6: Hose Management Arm in Field
Position
214047
19
Revision A