
UNLOADING AND ASSEMBLY
Form 169078
Revision C
11
STEP 4. INSTALL GAUGE
ROLLERS
If kit not supplied proceed to STEP 5. LOWER
HEADER. Otherwise install kit as follows:
NOTE
This kit may be installed later in the
header assembly sequence but it may be
easier prior to laying the header down.
a. Unpack gauge roller bundle.
b. Remove two locking pins (A) from each
assembly.
c. Remove nuts, bolts, and clips (B) from
assembly.
d. Insert tabs on roller assembly into slots (C) on
cutterbar at outboard mounting locations on
frame, and secure to support bracket with
locking pin (A) at “lowest position”.
e. Attach clips (B) with bolts and nuts removed at
step c. to secure roller assembly to cutterbar.
f. Tighten nuts.
NOTE
Use a socket and ratchet wrench to
access the nuts.
g. Remove locking pin (A), and adjust rollers to
desired height. Re-install both locking pins (A).
h. Ensure that nut (D) on each pin registers in
adjacent hole in support bracket.
i. Secure pins with hairpins (E).
j. Repeat above steps for opposite side. Set both
gauge rollers to same position.
B
A
C
B
A
A
E
D
Summary of Contents for A30-D
Page 53: ...NOTES Form 169078 Revision C 53 ...
Page 55: ......