64
INDEX
A
Additional Torque..................................... 24
Adjustable Flow Control ........................... 18
Adjusting Safety Chain Length................. 18
Assembly Instructions .............................. 10
Loading Arm Assembly ........................ 12
B
Bale Deflector .......................................... 21
Bale Diameter .......................................... 37
Bale Moisture ........................................... 37
Bale Retainers ......................................... 24
Bale Sizes .................................................. 1
Battery Connections................................. 17
C
Cable Drum Bearings............................... 29
Cable Lubrication ............................... 29, 32
Cable Replacement ................................. 29
Cable Tension.................................... 19, 31
Cable Ultimate Breaking Strength............ 29
Carrier Operation ..................................... 20
Bale Pusher Operation......................... 23
Carrier Controls.................................... 20
Loading Bales ...................................... 21
Pre-Start Checklist ............................... 20
Transporting Carrier ............................. 25
Control Handle ................................... 17, 20
Control Handle Wiring.............................. 17
Converting Fixed Arm to RPU.................. 15
D
Drawbar Pin ............................................. 18
Driving Direction....................................... 21
E
Engaging Skid Hooks............................... 35
Excess Axle Beam ................................... 19
H
Height Adjustment.................................... 18
Hitch Clevis Adjustment ........................... 18
Hydraulic Bypass ..................................... 23
Hydraulic Hook-up ................................... 17
I
Installing Plastic Tube .............................. 36
Introduction.................................................1
L
Lighting Coupler .......................................18
Lubrication Locations................................28
M
Maintenance
Cable ....................................................29
Chain/Sprockets ...................................27
Fasteners..............................................26
Hydraulic System..................................27
Lubrication ............................................28
Wheels/Tires.........................................28
Methods of Operation, Bagger .................34
O
Opening Pressure, Sequence Valve ........22
Operation ..................................................16
Adjusting Right Wheels.........................19
Attaching Bale Carrier to Tractor ..........18
Cable Tension.......................................19
Chain Tension.......................................19
Hydraulic/Electrical Control...................17
To the New Operator ............................17
Your Responsibilities as an
Owner/Operator ................................16
Overbalancing the Load ...........................23
P
Parts ...................................................40–59
Carrier.............................................44–45
Decals.............................................52–53
Drive Assembly...............................46–47
Frame .............................................42–43
Hydraulic/Electrical .........................50–51
Pusher Assembly............................48–49
RPU ................................................54–55
RPU Hydraulics ..............................56–57
Silage Bagger (Optional) ................58–59
Tandem Axle...................................40–41
Pilot Check Valve Assembly .....................13
Plastic Tube Size......................................37
Positioning Bale Fork................................12
Preventing Rust ........................................32
Pusher Position ........................................21
Summary of Contents for 1000
Page 1: ...1...
Page 21: ...21...
Page 30: ...30...
Page 43: ...43 PARTS TANDEM AXLE...
Page 45: ...45 FRAME...
Page 47: ...47 CARRIER 4 RIGHT BALE LIFT ARM ASSEMBLY...
Page 49: ...49 DRIVE ASSEMBLY...
Page 51: ...51 PUSHER ASSEMBLY...
Page 57: ...57 RPU...
Page 59: ...59 RPU HYDRAULICS...
Page 61: ...61 SILAGE BAGGER OPTIONAL SLIDE RAILS OPTIONAL...