15
3. Connect 68” hose from tee on SOLENOID
CHECK VALVE to male connector on
pilot check valve assembly.
4. Connect 102” hose from rod end port of
the ROTATE CYLINDER and #2 port of
the sequence valve to straight male
adapter on the pilot check valve. Remove
80” hose from elbow fitting in port #2 of
the SOLENOID VALVE. Connect one end
of 80” hose to clevis end of the ROTATE
CYLINDER and the opposite end to tee
fitting on LIFT CYLINDER. NOTE: Make
sure both hoses are inserted through
hose loops along the top of the BALE
LIFT ARM.
5. Connect 60” hose to elbow fitting in port
#2 of the solenoid valve. Connect
opposite end to male tee in port #1 of
sequence valve.
PORT #2
SOLENOID VALVE
80" HOSE
102" HOSE
ROTATE CYLINDER HYDRAULICS
SOLENOID CHECK VALVE
68" HOSE
ATTACH HOSE TO SEQUENCE VALVE
SEQUENCE
VALVE
Summary of Contents for 1000
Page 1: ...1...
Page 21: ...21...
Page 30: ...30...
Page 43: ...43 PARTS TANDEM AXLE...
Page 45: ...45 FRAME...
Page 47: ...47 CARRIER 4 RIGHT BALE LIFT ARM ASSEMBLY...
Page 49: ...49 DRIVE ASSEMBLY...
Page 51: ...51 PUSHER ASSEMBLY...
Page 57: ...57 RPU...
Page 59: ...59 RPU HYDRAULICS...
Page 61: ...61 SILAGE BAGGER OPTIONAL SLIDE RAILS OPTIONAL...