8
www.mac-srl.it
01_IN.CSA.300_01 200220
1
2
3
4
300
220
h
mod.
B
h
C275A
500
710
700
910
800
1010
GBR
BOLLARD LAYING PROCEDURE
Proceed with the realization of the drain of the
rainwater through the lay of a PVC pipe with
100mm diameter. This pipe must be connected
to the sewer system or in alternative to a well
equipped by an emptying system with a greater
depth.
Insert gravel with grain 22/32 mm diameter and
220m height. In order to avoid “retreats of settling”,
it is advisable to compact the gravel.
Insert a geotextile layer (gr. 300) on the compacted
gravel.
The size “
h
” are very important to ensure
that the formwork protrudes 20mm from the
trampling line.
Summary of Contents for C275A
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...
Page 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...
Page 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...
Page 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...