PREPARATION OF THE EXCAVATION

To do a proper installation of our product, we recommend to follow all the points below.

Excavate the land with the measures and depth indicated below.

Plan view

Sectional view

Make sure that the interested soil for the installation of the product is draining by pouring 40 liters of water into the 
excavation. 
If after 10 minutes the excavation has emptied, means that it isn’t necessary to install a sewage network.
Individual cases should however be evaluated, considering the soil compliance and the meteorological situations.
Eventually, create a sewer system.

Caution:
This type of system has been thought for land with poor draining qualities, where, digging, water is immediately 
found and/or where there is not the possibility to carry everything in a sewer system. The bollard will be collocated 
in a waterproof concrete tank so if the water level raises, the bollard remain isolated from the surrounding land. 
This drawing shows how to install a well for the discharge of the excessive water from the formwork of the bollard. 
All the concrete that covers the bollard and the well should contain special additives that isolate from water.
Even just one well can be installed to suck the water of all the bollards installed.

Little well or sewer network 
connection with immersion 
pump 

Little well with manhole EN124

Sewer network connection 

Immersion pump

Summary of Contents for C275A

Page 1: ...00_FS 00 200220 C275A MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature...

Page 2: ...HE MAINTENANCE 18 BOLLARD S CLIMB STRENGTH REGULATION 19 SENSITIVE HEAD EXTRACTION 20 REGULATION AND ADDITIONAL CENTERING 21 OIL CHANGE 22 SELF REGULATING RESISTANCE 23 ACOUSTIC BUZZER 24 WARRANTY 25...

Page 3: ...info mac srl it 3 00_FS 00 200220 C275A A B C D 273 500 481 731 273 700 481 931 273 800 481 1031 A B D C GBR DIMENSIONS...

Page 4: ...II B 2 All II B 3 All II B 4 All II B 6 All II B 7 All II B 8 All II B 5 Morciola di Vallefoglia 07 01 2013 APPROXIMATELY MACHINE DECLARATION OF INCORPORATION IN ACCORDANCE WITH THE EUROPEAN DIRECTIV...

Page 5: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been ri...

Page 6: ...non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regul...

Page 7: ...ally create a sewer system Caution This type of system has been thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carr...

Page 8: ...diameter This pipe must be connected to the sewer system or in alternative to a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In o...

Page 9: ...to protrude 20mm from the oor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is lled uniformly Deal the concrete so as to not t...

Page 10: ...200220 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidi ed before...

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ...ants and the devices must be submitted to a regular technical maintenance The detected defects must be removed as soon as possible because they may compromise the safety and the health Regardless of w...

Page 26: ...ke Not to weld and move close ames during the replacement operations and the ll of the uid Not to make welding in presence of uids Not to carry out any operation when the product is activated Never to...

Page 27: ...ll the circuit components are installed and ready for the use Control that the pipes are correctly connected by checking the tightening of the joints so as to avoid damages and uid leaks Before to pro...

Page 28: ...provided Yes Check the release func onality Yes Check the oil leaks from roller tubes vents control unit release Yes Check with simple tests the correct electrical or mechanic safe es like sensible he...

Page 29: ...wer consump on An electric absorp on increase at the same payload pressure indicates plant anomalies Yes Check the uid temperature The uid never must exceed 90 C The passing of this value is a cause o...

Page 30: ...rns or indicators state Magne c coil photocells state Electric valve state where provided Hydraulic system e ciency state control unit unlock piston Hydraulic oil state oil level and quality degraded...

Page 31: ...______________________________________________________ Model Type Serial Number Safety devices _______________________________________________________________________________ Model Type Serial Number...

Page 32: ...Lubrication devices 11 Counterweights and suspensions 12 trapezoidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal ligh...

Page 33: ...oidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal lights 16 Sensitive head additional pressure switches 17 Electric va...

Page 34: ...y work hours Replace the oil Oil with solid bodies in it Manual unlock is open See point 1 See point 1 electric valves are open Electrical valve broken Replace the electrical valve Mechanic aw Low vol...

Page 35: ...lock is open See point 1 See point 1 electric valves are open See point 1 Irregular set of the limit switch sensors Wrong reading of the limit switch Set the limit switch in the right posi on check th...

Page 36: ...ntacts Replace the limit switch Contact oxida on No contact lubrica on Do ordinary maintenance Contact the constructor 15 SENSITIVE HEAD DOESN T INVERT THE MOVEMENT See point 15 See point 15 See point...

Page 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...

Page 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...

Page 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...

Page 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...

Reviews: