4. GENERAL ASSEMBLY OF HALF ELEMENT SECTIONS 

We recommend assembling the half element sections on 
a clean, flat surface.  There is an assembly drawing for 
each of the six elements with both the right and left 
halves shown on each page.  We also recommend 
briefing yourself with the general directions before 
skipping to the assembly drawings. 

The general assembly procedure for a half element section 
begins with laying each capacitor assembly on a level 
surface, with the 10m capacitor tube on the left hand side.  
Locate the two swaged 3/4” dia. tubes and the 5/8 x 6” 
fiberglass rod. 

NOTE: BE SURE TO USE THE CORRECT 

LENGTH 3/4” SECTIONS MATCHING UP WITH THE 10M 
CAPACITOR LENGTH.

 Insert the fiberglass rod into the 

LIGHTLY swaged end side of the longer 3/4” section.  Align 
the two holes and secure loosely with a single 8-32 x 1” screw 
and lock nut in the outer hole as shown in Figure 4.  Next 

slide the other end of the fiberglass rod into the center hole of the 10M shorting bar connected to the 10m 
capacitor.  Slide the larger diameter swage of the shorter 3/4” X 12” tubing through the hole of the shorting bar 
connected to the 15m capacitor tube.  Secure with a single 8-32 x 1” screw and locknut, again through the 

OUTER HOLE 

in the figure.  Now insert the inner two 8-32 x 1” screws and locknuts, and tighten LIGHTLY. 

NOTE: IF YOU OVER TIGHTEN, YOU MAY NOT BE ABLE TO MOVE THE SHORTING BARS TO FINAL 
POSITION.    Slide the two shorting bars right up against the two inner locknuts as shown.  Now tighten all four 
inner and outer screws and locknuts.  Position the capacitor tube assembly so that the gap rests in between the 
two shorting bars and MAKE SURE THE MARKS YOU MADE ON THE 3/8” TUBE ARE 

UP

.  Tighten all of the 8-

32 hardware installed to this point. 
Locate the appropriate 1/2” element tip section and insert the end with 2 holes into the 3/4 x 12” swaged end. 
Secure the 1/2” tip with two 8-32 x 1” screws and locknuts. With a tape measure hooked to the inner edge of the 
15m capacitor tube shorting bar, make a mark on the 3/8” tube at the dimension called out for the 15m shorting 
bar.  Slide the 15m shorting bar onto the 3/8 and 1/2“ tube and set the inner edge of the bar to the mark. Install 

two 8-32 x 1” screws, add locknuts, align with the other bars and tighten.   
Locate the 10m shorting bar and the shorter 3/8” tube.  Using a tape measure connected to the inner edge of the 
10m capacitor tube shorting bar, mark the dimension called out for the 10m shorting bar.  Slide on the 10m 
shorting bar, set the inner edge to the mark and tighten the top 8-32 screw.  Now insert the shorter 3/8” tube 
through the other hole on the 10m shorting bar and into the free hole on the 10m capacitor tube shorting bar.  
Allow the tube to extend 1” past the shorting bar connected to the 10m capacitor and tighten the 8-32 hardware 
on both of the shorting bars.   
 
 
Using the general directions above and the six TIP DIMENSION / ASSEMBLY drawings, proceed in fabricating 
the 12 half element sections.  After double checking your dimensions and making sure that your elements are 
labeled correctly proceed to the next step. 
 

KT36XA ASSEMBLY MANUAL 

Summary of Contents for KT36XA

Page 1: ...l driven element log cell creates a rig pleasing flat match and broad gain front to back curves across 10 15 and 20m A 3 kW 4 1 balun efficiently matches the antenna to 50 All hardware has been upgrad...

Page 2: ...bar apply a light coating to the walls as indicated in the figure Next install the 8 32 hardware listed to the right of each part into each respective shorting bar Remember to apply a light coating o...

Page 3: ...and 3 8 tubes insert the 3 8 tube as shown in Figure 3 into the back end of the 15m capacitor assembly Move the capacitor up the length of the tube until the face of the black capacitor cap ON THE SH...

Page 4: ...inner locknuts as shown Now tighten all four inner and outer screws and locknuts Position the capacitor tube assembly so that the gap rests in between the two shorting bars and MAKE SURE THE MARKS YO...

Page 5: ...h their faces towards one another onto the 1 4 20 bolt posts on each element assembly and thread on the 1 4 20 locknuts Do not tighten the locknuts at this time Paying close attention to the DIMENSION...

Page 6: ...sets Allow the ends of the phasing lines to stick out 4 past the ends of the clamp blocks Now pull the phasing lines back guiding them into the clamp block set on the other driven element Now re tigh...

Page 7: ...ote the approximate height at which the boom becomes level usually about 3 feet During final installation on the tower mast secure the turnbuckle plate at the appropriate height with the 2 U bolt Then...

Page 8: ...KT36XA HALF ELEMEN GENERAL ASSEMBLY...

Page 9: ...KT36XA ASSEMBLY MANUAL...

Page 10: ...REAR DRIVEN ELEMENT DIMENSIONS...

Page 11: ...FRONT DRIVEN ELEMENT DIMENSIONS...

Page 12: ...1ST DIRECTOR ELEMENT DIMENSION...

Page 13: ...2ND DIRECTOR ELEMENT DIMENSION...

Page 14: ...3RD DIRECTOR ELEMENT DIMENSIONS...

Page 15: ...DUAL DRIVEN AND T MATCH ASSEMBLIES...

Page 16: ...KT36XA DIMENSION SHEET...

Page 17: ...x 37 1 4 2 T Feed Tubes 1 2 x 049 x 23 1 2 2 Linear Loading Tube 3 8 x 049 x 80 4 Linear Loading Tube 3 8 x 049 x 74 4 Linear Loading Tube 3 8 x 049 x 72 2 Phasing Line Tube 3 8 x 049 x 57 2 Linear L...

Page 18: ...capacitor tube 10 Shorting Bar 10m 10 T Match Shorting bar 1 4 x 1 1 4 x 3 13 16 2 IN BAG 9 Shorting Bar Insulator Delrin Black 1 1 2 Dia 10 IN HARDWARE BAG 10 Nut 3 8 16 ss 6 Lockwasher 3 8 split rin...

Page 19: ...3 4 X 23 6 3 4 X 21 4 SOE 1 BUNDLE 3 4 X 12 SBE 1 BUNDLE ALL 1 2 TUBES 1 TURNBUCKLE EYEBOLT BAG 1 ODDBALL PARTS BAG 1 CAPACITOR CAP BAG 1 SHORTING BAR BAG 1 BLACK DELRIN INS BAG 1 BALUN HF 4 1 1 DACR...

Page 20: ...CITOR TUBE BUNDLE 1 SHORT 3 8 TUBE BUNDLE 1 MED LONG 3 8 TUBE BUNDLE 1 FIBERGLASS INSULATOR 7 8 X 14 3 4 2 BOOM TO MAST PLATE 1 4 X 6 X 8 1 SHORT FG ROD BAG 1 3 U BOLT BAG 1 2 1 2 2 U BOLT BAG 1 CLAMP...

Reviews: