M2 KT36XA Assembly Manual Download Page 5

5.  HF CLAMP PLATE PAIR ASSEMBLY 
Locate the 11 element clamp plates, the Balun ‘L’-Bracket, 2-1/2” U-bolt & Saddle, and element clamp cap.  
Assemble the plates into six pairs with the radii facing each other using four 1/4-20 x 2” bolts.  On one of the 
‘alike’-pair combinations, attach the Balun ‘L’-Bracket to the outside clamp plate with the flat side up and higher 
than the plates.  Install the 2-1/2” U-bolt & Saddle combination on the top side of the ‘L’-Bracket and secure with 
5/16” nuts and lockwashers.  This assembly will be used for the FRONT DRIVEN ELEMENT.  Finger tighten all 
the hardware.  The ‘oddball’ plate combination of element clamp plate and smaller clamp cap, will be used for 
DIRECTOR #2.   
 
6.  FRONT AND REAR DRIVEN ELEMENT ASSEMBLY 
Take the element clamp plate pair assembly for the FRONT DRIVEN ELEMENT (previous step) and one of the 
‘alike’ element clamp pairs, and for both insert a 7/8 x 14-3/4” fiberglass rod through the plates.  Orient the four 
holes up and make sure the rod is centered.  Tighten the four bolts evenly on the clamp plates.  Locate the four 
7/8” poly disc insulators.  Slide a poly disc onto both ends of each 7/8” fiberglass rod and position them right up 
against the element clamp plates.  If the discs won’t fit onto the rod, try soaking them in HOT water for a few 
minutes.  Locate four of the 1 x 72” SOE (swaged one end) tubes.  Select two to be used for the FRONT 
DRIVEN ELEMENT.  Locate the two ‘T’-match shorting bars and slide one onto each of the straight ends of the 
1” tubes you have selected.  The other pair of 1 x 72” SOE tubes will be for the REAR DRIVEN ELEMENT.  For 
all four 1” tubes, slide the straight ends on both sides of the two fiberglass rods.  Align the holes, insert two 1/4-
20 x 2” bolts up through the bottom, and temporarily lay the two assemblies flat.  Locate the eight 3/8” clamp 
blocks.  Spread a little Penetrox on each clamp block face.  Slide two clamp blocks with their faces towards one 
another onto the 1/4-20 bolt posts on each element assembly and thread on the 1/4-20 locknuts.  Do not tighten 
the locknuts at this time.  Paying close attention to the DIMENSION SHEET, insert the individual element halves 
for the FRONT and REAR DRIVEN ELEMENTS into the swaged ends of the 1 x 72” tubes.  Secure them with 8-
32 x 1-1/4” screws and locknuts.  Make sure the flat part of the ‘L’-Bracket is pointed in the same direction as the 

capacitor tube sides of the FRONT 
DRIVEN ELEMENT halves. 
        
7.  REFLECTOR, DIRECTOR #1, AND 
DIRECTOR #3 ASSEMBLY 
Locate the remaining six 1 x 72” SOE 
(swaged one end) tube sections and the 
three 7/8 x 36” aluminum center sleeves.  
With the three remaining pairs of ‘alike’ 
element clamp plates, insert a 7/8” center 
sleeve and slide a 1 x 72” tube section onto 
both sides of the sleeve. Align the two 
holes and secure with 1/4-20 x 1-1/2” bolts 
and locknuts.  Orient the tubes so that the 
locknuts are down and centered.  Tighten 
the 1/4-20 hardware evenly.  A 1” gap 
between the two tube sections is normal.  
  
8.  DIRECTOR #2 ASSEMBLY 
Locate the 1 x 20” SBE (swaged both ends) 
center support tube and insert this piece 
between the plates of the remaining 

‘oddball’ element clamp assembly.  Orient the tube holes up, center the tube, and tighten the 1/4-20 hardware.  
Now insert the two 3/4 x 48” SOE tubes into both ends of the center support tube and secure with 8-32 x 1-1/4” 
screws and locknuts.  Add the 1/2” element tip sections to the 3/4” tubes, securing them with 8-32 x 1” screws 
and locknuts. 
 
9.  BOOM ASSEMBLY 
Prior to assembling the boom, inspect each mating surface and holes for any metal chips or burrs.  Apply a light 
coating of PENETROX to the swaged ends of each piece.  Using the DIMENSION SHEET as a guide, lay out 
the five 3” pieces as shown.  Note that the single straight section is the FRONT end of the antenna.  Now 
assemble the boom and secure the pieces together with 1/4-20 x 3-1/2” bolts and locknuts.  Next insert the two 
3/8 x 6” eyebolts through the holes at both ends of the boom.  Secure them with 3/8” nuts and lockwashers.   
 
 

KT36XA ASSEMBLY MANUAL 

Summary of Contents for KT36XA

Page 1: ...l driven element log cell creates a rig pleasing flat match and broad gain front to back curves across 10 15 and 20m A 3 kW 4 1 balun efficiently matches the antenna to 50 All hardware has been upgrad...

Page 2: ...bar apply a light coating to the walls as indicated in the figure Next install the 8 32 hardware listed to the right of each part into each respective shorting bar Remember to apply a light coating o...

Page 3: ...and 3 8 tubes insert the 3 8 tube as shown in Figure 3 into the back end of the 15m capacitor assembly Move the capacitor up the length of the tube until the face of the black capacitor cap ON THE SH...

Page 4: ...inner locknuts as shown Now tighten all four inner and outer screws and locknuts Position the capacitor tube assembly so that the gap rests in between the two shorting bars and MAKE SURE THE MARKS YO...

Page 5: ...h their faces towards one another onto the 1 4 20 bolt posts on each element assembly and thread on the 1 4 20 locknuts Do not tighten the locknuts at this time Paying close attention to the DIMENSION...

Page 6: ...sets Allow the ends of the phasing lines to stick out 4 past the ends of the clamp blocks Now pull the phasing lines back guiding them into the clamp block set on the other driven element Now re tigh...

Page 7: ...ote the approximate height at which the boom becomes level usually about 3 feet During final installation on the tower mast secure the turnbuckle plate at the appropriate height with the 2 U bolt Then...

Page 8: ...KT36XA HALF ELEMEN GENERAL ASSEMBLY...

Page 9: ...KT36XA ASSEMBLY MANUAL...

Page 10: ...REAR DRIVEN ELEMENT DIMENSIONS...

Page 11: ...FRONT DRIVEN ELEMENT DIMENSIONS...

Page 12: ...1ST DIRECTOR ELEMENT DIMENSION...

Page 13: ...2ND DIRECTOR ELEMENT DIMENSION...

Page 14: ...3RD DIRECTOR ELEMENT DIMENSIONS...

Page 15: ...DUAL DRIVEN AND T MATCH ASSEMBLIES...

Page 16: ...KT36XA DIMENSION SHEET...

Page 17: ...x 37 1 4 2 T Feed Tubes 1 2 x 049 x 23 1 2 2 Linear Loading Tube 3 8 x 049 x 80 4 Linear Loading Tube 3 8 x 049 x 74 4 Linear Loading Tube 3 8 x 049 x 72 2 Phasing Line Tube 3 8 x 049 x 57 2 Linear L...

Page 18: ...capacitor tube 10 Shorting Bar 10m 10 T Match Shorting bar 1 4 x 1 1 4 x 3 13 16 2 IN BAG 9 Shorting Bar Insulator Delrin Black 1 1 2 Dia 10 IN HARDWARE BAG 10 Nut 3 8 16 ss 6 Lockwasher 3 8 split rin...

Page 19: ...3 4 X 23 6 3 4 X 21 4 SOE 1 BUNDLE 3 4 X 12 SBE 1 BUNDLE ALL 1 2 TUBES 1 TURNBUCKLE EYEBOLT BAG 1 ODDBALL PARTS BAG 1 CAPACITOR CAP BAG 1 SHORTING BAR BAG 1 BLACK DELRIN INS BAG 1 BALUN HF 4 1 1 DACR...

Page 20: ...CITOR TUBE BUNDLE 1 SHORT 3 8 TUBE BUNDLE 1 MED LONG 3 8 TUBE BUNDLE 1 FIBERGLASS INSULATOR 7 8 X 14 3 4 2 BOOM TO MAST PLATE 1 4 X 6 X 8 1 SHORT FG ROD BAG 1 3 U BOLT BAG 1 2 1 2 2 U BOLT BAG 1 CLAMP...

Reviews: