background image

M5XADS

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201  Fax: +81(6)6659-8510  E-mail: [email protected]

EM-2777  P. 4 / 4

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Check DIP switch setting.
3) Power input voltage:  Check voltage across the terminal 

7 – 8 with a multimeter.

4) Input:  Check that the input signal is within 0 – 100% of 

the full-scale.

5) Output:  Check that the load resistance meets the de-

scribed specifications.

POWER INDICATOR LED

The transmitter is provided with a power indicator LED 
which blinks in different patterns indicating various oper-
ating status.
The following figure indicates typical patterns.

LED ON OFF PATTERNS

TRANSMITTER STATUS

Downloading the setting
Range setting
Fine adjusting
Supplying a fixed output

Normal

Abnormal Operation
(corruption of configuration data)

80ms

EQUATION

X

0

 = K

0

{K

1

(X

1

 + A

1

) + K

2

(X

2

 + A

2

)} + A

0

 X

1

 - X

2

: input signal (%) -2 - +102 %

 K

0

 - K

2

: gain (no units) ±29.999

 A

0

 - A

2

: bias (%) ±299.99 % 

Factory default setting
 K

0

 = 1, K

1

 = 1, K

2

 = 1, A

0

 = 0%, A

1

 = 0%, A

2

 = 0%

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Warm up the unit for at least 10 minutes.  Apply the input 
signals which should lead the calculated results as 0%, 25%, 
50%, 75% and 100%.  Check that the output signal for the 
respective input signal remains within accuracy described 
in the data sheet.
When the output is out of tolerance, recalibrate the unit us-
ing the PC Configurator Software (model: M5CFG).

LIGHTNING SURGE PROTECTION

M-System offers a series of lightning surge protector for 
protection against induced lightning surges.  Please contact 
M-System to choose appropriate models.

Reviews: