LHPM POST MOUNTED HEATER CARE & USE/INSTALLATION
|
7
LIGHTING INSTRUCTIONS
Read the ‘User Manual/Installation Instructions carefully and completely before using your heater to reduce
the risk of fire, burn hazard or other injury.
WARNING
LIGHTING
1. Open manual gas supply valve (ensure gas supply lines have been purged).
2. Turn on switch to energize electric supply.
3. The electronic control module will begin the ignition period in 3 seconds.
4. The gas valve will open and ignition spark will commence and continue for 20 sec.
5. If flame starts and “is detected”, flame will continue until turned off.
6. If no flame is detected, the gas valve will close after 20 sec. A “wait’ period commences and lasts approximately
5 sec. and a second trial for combustion commences. The electronic control will attempt three trials for ignition
before locking out for approximately 5 minutes at which time it will automatically try again. Electronic control of
heater can be re-set by de-energizing and re-energizing electric power.
SHUT DOWN
1. Turn off power to electronic control.
2. For longer periods of shut down, also close manual gas supply valve.
SUPPLIES NEEDED
1. Heater post anchoring hardware.
2. Materials necessary to construct a concrete base for floor mounting.
3. Gas supply line that is installed to the Gas and Electric Supply according to the: National Fuel Gas Code, ANSI
Z.223.1 (NFPA 54) in the US and CAN/CGA B149.1 and B149.2 Installation Codes in Canada. 4. Electrical supply
rated at 24 Vac with two stage control