background image

LHPM POST MOUNTED HEATER CARE & USE/INSTALLATION

  

|

11

ASSEMBLY

Mount pole base onto a concrete floor or cast concrete with minimum below grade depth of 12” and having a 12” 
diameter. If forming concrete, cast in place appropriate passage for gas and control wires. Use minimum 3/8” x 5” 90° lag 
bolts or equivalent to mount heater base to the concrete base. The pole base could also be mounted on wood decks with 
3/8” bolts and lock washers on the underside of the deck. Periodically check for tightness when mounted to a wood deck.

STEP 1

Summary of Contents for LHPM

Page 1: ...CARE USE INSTALLATION MAKE THE MOST OF YOUR LYNX POST MOUNTED HEATER LHPM ...

Page 2: ... warn customers of potential exposure to such substances To minimize exposure to the substances always operate this unit according to the use and care instructions found in this manual Be certain to provide adequate ventilation IF YOU SMELL GAS 1 Shut off all gas supply lines to the heater 2 Extinguish any open flames 3 If odor continues keep everyone away from the grill accessory and immediately ...

Page 3: ...ilure to comply can result in a serious fire and personal injury hazard Certain materials when stored under this heater are subjected to radiant heat that can soften distort or otherwise be damaged special care should be taken of plastic materials Appliance surfaces other than the obvious flame and emitter surfaces attain elevated temperatures during operation Do not touch the heater head during o...

Page 4: ... LHPM POST MOUNTED HEATER CARE USE INSTALLATION PRE INSTALLATION OVERVIEW WHAT YOU WILL RECEIVE TOP REFLECTOR POLE ASSEMBLY HARDWARE ELECTRIC SWITCH KIT HEATER HEAD ASSEMBLY Assembly delivers in 4 boxes ...

Page 5: ...ading this manual This manual includes important safety tips You should keep it handy for easy reference Also at Lynx we enjoy hearing from our customers We like to hear about your successes but also about any difficulties you are having Please feel free to contact us with any questions or problems or just to share a new recipe Please include the model number of your appliance in your corresponden...

Page 6: ...6 LHPM POST MOUNTED HEATER CARE USE INSTALLATION PRE INSTALLATION OVERVIEW MOUNTING PLATE HOLE PATTERN FULL SIZE ...

Page 7: ...20 sec A wait period commences and lasts approximately 5 sec and a second trial for combustion commences The electronic control will attempt three trials for ignition before locking out for approximately 5 minutes at which time it will automatically try again Electronic control of heater can be re set by de energizing and re energizing electric power SHUT DOWN 1 Turn off power to electronic contro...

Page 8: ...not limited to attached garages solariums living quarters etc A patio that has been almost entirely closed in with a roof and windbreak walls or a tent may be considered an indoor location by some code authorities Venting of the flue gases is accomplished by means of an interlocked fan Refer to the National Fuel Gas Code ANSI Z 223 1 NFPA 54 in the US and CAN CGA B149 1 and B149 2 Instalation Code...

Page 9: ... placement of plastic or vinyl in the proximity of the heater as they tend to distort and soften at these temperatures 18 22 33 High fire rate 53 000 btuh Low fire rate 46 000 btuh Gas supply pressure Minimum Maximum Natural Gas Minimum 6 5 W C at orifice 14 W C at inlet Electric Supply 24 VAC 0 8A Installation or repair should only be done by personnel qualified for the installation of powered ga...

Page 10: ...nd or for the USA National Fuel Gas Code ANZI Z 223 1 NFPA 54 and for Canada CAN CGA B149 1 and B149 2 National Gas and Propane Installation Code latest editions Appliance must be electrically grounded in accordance with local codes or in their absence the National Electrical Code ANSI NFPA 70 in the USA CSA CZ21 1 Canadian Electrical Code in Canada ...

Page 11: ... a 12 diameter If forming concrete cast in place appropriate passage for gas and control wires Use minimum 3 8 x 5 90 lag bolts or equivalent to mount heater base to the concrete base The pole base could also be mounted on wood decks with 3 8 bolts and lock washers on the underside of the deck Periodically check for tightness when mounted to a wood deck STEP 1 ...

Page 12: ... and gas hose are arranged as illustrated Feed a pull wire through the pole to assist in pulling the three power wires into the pole and through the junction box Firmly tape the pull wire to the power wires Lower the assembly into place while pulling the wires Two people may be necessary for this operation STEP 2 ...

Page 13: ...LHPM POST MOUNTED HEATER CARE USE INSTALLATION 13 ASSEMBLY continued Secure burner head to pole with three 8 screws Please note the lights ony activate when in use STEP 3 ...

Page 14: ...TED HEATER CARE USE INSTALLATION ASSEMBLY continued Push the gas connection into the slot buy slightly pushing on the gas line through the electrical box The gas fitting should be positioned as illustrated below STEP 4 ...

Page 15: ...PM POST MOUNTED HEATER CARE USE INSTALLATION 15 Place gas connection cover onto the fitting and install the nut to fasten the cover assuring the nut is properly seated See below ASSEMBLY continued STEP 5 ...

Page 16: ...EATER CARE USE INSTALLATION ASSEMBLY continued Install reflector using the four carriage bolts nuts and washer provided Connect gas supply and electric power following all local codes Pressure test all gas connections STEP 6 ...

Page 17: ...gth of wire We recommend a minimum 18 AWG gauge wire rated for outdoor use This wiring kit is provided with a 24 Volt AC supply with a minimum 20 VA capacity The wiring kit provides one black lead for connection of the switch to the transformer Mount the transformer in a location protected from the weather The diagram on page 18 is the recommended control circuit for operating this appliance Optio...

Page 18: ...on Inspect condition of high tension lead to spark rod Annually verify hose gas supply in heater post and all connections for gas leaks 1 No gas supply at burner Ensure manual shut off valve is in proper position Ensure there is pressure and flow at inlet to gas valve Ensure gas valve gets 24v power from control module during ON cycle 2 No spark Ensure control module has 24VAC supply Ensure spark ...

Page 19: ...ACKAGE 32591 B GAS HOSE ASSEMBLY 33285 C EMITTER 33286 D FLAME SENSOR 33287 E SPARK ELECTRODE 33288 F ELECTRONIC CONTROL MODULE 33289 ITEM DESCRIPTION PART G ORIFICE NAT GAS 33290 H GAS VALVE ASSEMBLY 33291 I INDICATOR LIGHT 33292 J BURNER ASSEMBLY 33293 K POLE PACKAGE 32590 L IGNITION WIRE 33294 ...

Page 20: ...20 LHPM POST MOUNTED HEATER CARE USE INSTALLATION INTERNAL WIRING ...

Page 21: ... lasts or the exclusions of or limitations on consequential damages This warranty gives you specific legal rights and you may have other rights which vary from state to state 7 No one has the authority to add to or vary Lynx s warranty or to create for Lynx any other obligation or liability in connection with the sale or use of its products 8 Limited to the replacement of defective parts with the ...

Page 22: ...2017 The best outdoor kitchen products come from Lynx Grills Inc 7300 Flores Street Downey CA 90242 Service 888 289 5969 Fax 562 299 6789 www lynxgrills com ...

Reviews: