Installation
Installation examples
21
© Lutz-Jesco GmbH 2015
Subject to technical changes.
150413
BA-24721-02-V01
Chlorine gas changeover unit C 7523
Operating instructions
7.6.2 Installation with a positive pressure manifold
Fig. 14:
M
Installation with a positive pressure manifold
Position
Description
Position
Description
A
Room for the chlorine gas supply
8
Changeover unit with 5 service valves
B
Dosing device room
9
Dosing device
1
Chlorine barrel
10
Injector with non-return valve
2
Chlorine barrel scale
11
Motive water pump
3
Pressurised manifold
12
Gas warning device
4
Chlorine gas filter
13
Horn
5
Moisture eliminator with heating collar
14
Gas sensor
6
Vacuum regulator
15
Entrance port of the chlorine eliminator
7
Activated carbon cartridge
Table 16: Designation of components
A
B
12
1
2
3
6
8
7
9
10
13
5
11
15
4
14