Installation
Installing the device
16
© Lutz-Jesco GmbH 2016
BA-20901-02-V01
Chlorinator C 2526
Operating instructions
7.2 Installing the device
7.2.1 Installing the wall device
The wall device must be installed perpendicularly to the wall surface in a
way that makes it easily accessible to the operator. The flow meter should
be mounted at c. eye-level.
Precondition for action:
ü
A flat wall.
ü
The mounting material is suitable for the wall.
Resources required:
@
Water level
@
Drill
@
Fork wrench SW10
Perform the following working steps:
1.
Hold the device against the wall and align it so that the flow meter is
vertical.
2.
Mark the mounting point on the wall.
3.
Drill in the marked holes and insert the rawlplug.
4.
Secure the wall panel with the screws and the washers included in
the scope of delivery.
ü
The device is fitted on the wall.
7.2.2 Installing the cabinet
The cabinet is set up and installed on a level floor; often on a slight-
ly-raised base. The device must be accessible for maintenance work from
the rear.
Precondition for action:
ü
The floor is level.
ü
The mounting material is suitable for the wall.
Resources required:
@
Drill
@
Ring spanner SW 13
Perform the following working steps:
1.
Remove the cover from the device (see fig. 9)
2.
Place the device in the desired position. Ensure that the frame fits
well and does not wobble.
3.
Mark the anchor points on the floor and remove the device.
4.
Drill in the marked holes and insert the rawlplug.
5.
Return the device and screw it to the floor on all anchor points (see
Fig. 9).
6.
Return the cover (6).
ü
The device is fitted on the floor.
Fig. 8: Opening the cabinet
Fig. 9: Fixing the cabinet
1
2