119
A
Arrival on Site ......................................... 24
Levelling the caravan ........................ 24
Siting/Unhitching ............................... 24
Awning Fixing Points .............................. 86
B
Battery .................................................... 58
Blinds ..................................................... 91
Breakaway Cable ................................... 17
Bulb Replacement ................................ 113
C
Caravan Handling .................................. 22
Caravan Towing Code .............................. 4
Carbon Monoxide Alarm ........................ 29
Chassis & Undergear ........................... 100
AL-KO Running Gear ...................... 100
General Notes on Maintenance ...... 103
D
Distribution of Weight ............................... 8
E
Electrics ................................................. 42
13 pin wiring diagram ........................ 20
230V Mains Electric Equipment
Usage ........................................... 42
Instructions for Electricity Supply ...... 42
F
Fire Action .............................................. 28
Fire Extinguisher .................................... 29
Fire Precautions ..................................... 28
Flyscreens .............................................. 91
Fuses ..................................................... 54
INDEX
G
Gas ........................................................ 38
Gas Bottles ........................................ 38
Gas Safety Advice ............................. 40
Precautions ....................................... 40
Types of Gas ..................................... 39
General Data ........................................ 113
Lunar Owner’s Club ........................ 114
Security ........................................... 113
Servicing ......................................... 114
H
Heater .................................................... 63
Hob
Thetford 3 Burner Hob ...................... 76
J
Jacking Points ........................................ 23
L
Lighting .................................................. 90
M
Mirrors .................................................... 19
Motorway Driving ................................... 22
N
Noseweight .............................................. 6
Number Plate ......................................... 19
O
Oven
Spinflow Combi Oven ........................ 74
P
Power Control System ........................... 46
Pre-load Checklist .................................... 8
Pre-tow Checklist ................................... 10
R
Refrigerators .......................................... 67
Dometic Model RMS 8500 ................ 67
Reversing ............................................... 22
Road lighting .......................................... 20
S
Security .................................................. 30
Vehicle Identification Number
(V.I.N.) .......................................... 30
Smoke Alarm .......................................... 28
Speed Limits .......................................... 22
Stabiliser, AKS2004 ............................... 11
Stability .................................................... 9
Stabilisers ............................................ 9
Sterilising ............................................... 34
T
Toilet
Cassette Toilet C-260 CWE .............. 78
Truma Combi Boiler ............................... 62
Tyres ............................................. 18, 104
General Recommendations ............ 104
Tyres & Pressures ........................... 104
V
Vermin .................................................. 114
W
Warranty
Extended Warranty .......................... 114
Owner’s Warranty ............................ 114
Validation ......................................... 114
Water System
Helpful Hints ...................................... 37
Pressure Switch ................................ 37
Setting Up the Water System ............ 36
Wheel Changing .................................... 23
Wheel Lock ............................................ 13
Wheels
Torque ............................................... 18
Winterization Guide .............................. 116
Summary of Contents for Caravans
Page 15: ...15 PREPARING FOR THE ROAD Fig 5 Fig 6 Fig 9 Fig 8 Fig 7 Fig 10...
Page 26: ...ON THE ROAD 26...
Page 31: ...31 SERVICES SERVICES Water 32 Gas 38 Electricity 42...
Page 44: ...SERVICES 44...
Page 45: ...45 ELECTRICS ELECTRICS Power Control System 46 Battery 58 Use of Generators 59...
Page 49: ...49 ELECTRICS 2 5 Control Panel Component Layout EC350 Digital Control Panel LED display...
Page 60: ...ELECTRICS 60...
Page 84: ...84 THETFORD TOILETS...
Page 85: ...85 THETFORD TOILETS...
Page 96: ...96 7 Fit the safety boards into position BUNK BEDS...
Page 106: ...GENERAL DATA 106...
Page 107: ...107 GENERAL DATA...
Page 108: ...GENERAL DATA 108...
Page 109: ...109 GENERAL DATA...
Page 110: ...GENERAL DATA 110 EC175 Power Supply Unit Consumer Circuits Roof...
Page 111: ...111 GENERAL DATA...
Page 112: ...GENERAL DATA 112...