18
4.
Put the base down and place the assembled collector and filt-
ration housing on it, and align the holes on the bottom end of
the four support rods with those on the base, then insert the
bolts and tighten. (Fig. 5.)
3.
Mount two support rods and proper block on the electric
power collector by bolt. (Fig. 3.)
Mount another two support rods with block and handle on the
filtration housing by bolt. (Fig. 4.)
5. Put the hook of the vertical stand upwards, align the two holes
with those on the filtration housing, insert the screw and
tighten. (Fig. 6.)
6. Attach the bottom end of the bag with the holder on the filtra-
tion housing, hold the holder on the hook, then fasten the strap.
Attach the lower bag on the bottom end of the filtration hous-
ing and faste the strap. (Fig. 7.)
The the machine has been finished assembly. A re-inspection is
necessary to do check whether the bolts and screws are loosing.
After the re-inspection, you can connect the machine to a power
source and have a trail run.
NOTE:
The trial run should be done according to the Safety
Rules.
Summary of Contents for 20960-0105
Page 1: ...Sp nsug Dust extractor BDC 85 20960 0105...
Page 2: ......
Page 43: ...41...
Page 47: ......