``
31-Open
Rigging Manual
Page:
4 of 15
Total Task Time:
N/A
Figure: 7
Figure: 7 is showing the foot pad
under the console. To secure use
¼ x 20 x 1” f/h screws to pre-drilled
and pre-tapped holes done at the
factory. Line holes up on hardtop
with pad holes and secure.
Remember to use 5200 sealant for
a water tight seal. This will be done
on all 4 pads under to upper
console.
Figure: 9 shows the hole into the
console in which all the harness feed
into the upper console through the
starboard console tube. Secure tube
with ¼ x 20 x 1-1/4” f/h screws with a
¼” washer, lock washer & hex nut.
Tighten and then use ¼” cap nut to
dress it off. Make sure to use 5200
sealant for water tight seal.
Figure: 9
Figure: 8 & 8a shows a picture of the
starboard fwd console tube with all the
harnesses already ran through it. It will
be secured to the Fwd hardtop leg for
shipment. Undo and feed harnesses
through the hole in the console in
figure: 9. Use 5/16” x 1” f/h machine
screws to secure fwd leg to hardtop
into pre-drilled and pre-tapped holes
that were set up at the factory.
Remember to use 5200 for water tight
seal. Port fwd leg will secure the same
way.
Figure: 8
Figure: 8a