31-Open
Rigging Manual
Page:
3 of 15
Total Task Time:
N/A
Once all lines are pulled snug as
shown in figure: 4.The console and
sunshade are ready to be put on
top of the hardtop. The whole
upper station can be picked up as
one piece. Make sure to support
the console when lifting. Best
procedure is to use a forklift and
pick up the upper station while still
on the cradle and slide upper
station off cradle once you get it
Figure: 5 is showing how to
connect the aft legs of the upper
tower to the ladder after the upper
station is in place. The outside leg
has a collar that tightens with allen
bolts and the inside tube connects
with allen bolts into each other.
Both the collar and allen bolts are
provided in the loose gear kit. This
will be the same on both the Port &
Starboard aft legs.
Figure: 6 is showing the base of the
seat pad. Install using ¼ x 20 x 1” f/h
screws provided in rigging kit to
secure seat. There will be pre-drilled
holes that have been pre-tapped at
the factory that you line holes in pad
up with for ease of installation. Make
sure to use 5200 sealant provided in
loose gear to get a water tight seal.
Do this with both pads that are under
upper bench seat.
Figure: 5
Figure: 6
Figure: 4