IRS31Pro-UMB
Operating Manual V10 / 01.2020
G. Lufft Mess- und Regeltechnik GmbH
21
7.5
Commissioning and Testing
Once the device has been properly installed and connected to the permissible supply voltage,
initialization takes place and measuring begins.
After successful installation of the road sensor, its correct functioning must be checked. To do this,
connect the sensor to an evaluation device. Check that communication between the sensor and the
evaluation unit is working properly. The road condition determined by the sensor should be checked with
dry and wet sensor.
The functional test is described in section 10, Configuration and Testing.