When connecting 60ECv2 and WNG24-BC battery cabinets to
PowerHouse 24 and WNG24-K power cabinets, respectively, the
instructions are provided in Outdoor Flexent CDMA Modular Cell 1.0/
2.0 Cabinet Installation Manual, 401-710-123.
The tasks mentioned on the previous page are to be performed after
completion of all site preparation tasks, which are covered in Flexent
Modular Cell 4.0/4.0B Outdoor Site Preparation Guidelines, 401-703-
413.
Important!
The procedures contained in this IP are based on
Lucent Technologies standard practices. Prior to beginning a
Modular Cell 4.0B cabinet, or battery cabinet installation,
installers should be familiar with these practices. If there is a
conflict, standard practices take precedence. However, this IP
takes precedence for identification of parts and materials specific
to a Modular Cell 4.0B cabinet, or battery cabinet installation.
Important!
Following installation of the Modular Cell 4.0B
cabinet, the next step is to test and integrate it into the network.
Procedures for testing and integration may be found in Installation
Engineering Handbook 238.