Chapter 4: Power and power alarm connections in Modular Cell 4.0B
.............................................................................................................................................................................................................................................................
cabinets with integrated power
Overview
Table 3 lists the procedures covered in Chapter 4 for AC power
connections in the Modular Cell 4.0B integrated power primary and
dual band cabinets, as well as installation of the WNG24-BC battery
cabinets.
Modular Cell 4.0B Primary Cabinet Serial Number:
_______________________________
Modular Cell 4.0B Dual Band Cabinet Serial Number:
_______________________________
WNG24-BC Battery Cabinet Serial Number:
_______________________________
Table 3
Chapter 4
COMPLETED
INSTALLATION STEP
PAGE
PERFORM THE NEXT FOUR STEPS IF INSTALLING A PRIMARY 4.0B CABINET WITH INTEGRATED POWER
Prepare the AC power module (ACPDA) for connection of the AC utility wires
4 - 7
Install a 2-inch flexible conduit fitting on the primary or dual band cabinet
4 - 9
Connect the flexible conduit between the existing metal conduit and the fitting
at the primary or dual band cabinet
4 - 10
Route and connect the AC utility wires in the primary or dual band cabinet
4 - 12
PERFORM THE NEXT THIRTEEN STEPS IF INSTALLING A FIRST BATTERY CABINET
Install the cable interface panel
4 - 15
Determine the battery shelf type
4 - 19
Connect the DC cables in the first WNG24-BC battery cabinet
4 - 20
Identify the individual interface panel cables on the battery cabinet side
4 - 24
Route and connect the fan power/alarm cable in the WNG24-BC battery
cabinet
4 - 26
Route and connect the fuse alarm cable in the WNG24-BC battery cabinet
4 - 28
Route and connect the intrusion alarm cables in the WNG24-BC battery
cabinet
4 - 30
Identify the individual interface panel cables on the primary cabinet side
4 - 33