![LTG feel cool HDC Installation And Operating Instructions Manual Download Page 33](http://html1.mh-extra.com/html/ltg/feel-cool-hdc/feel-cool-hdc_installation-and-operating-instructions-manual_1945061033.webp)
Original Instructions for Installation, Use and Maintenance
Active Chilled Beam Type HDC
Section:
Page:
Date:
AG--B 213.1e
33
Feb. 2010
The Innovation Company
LTG Aktiengesellschaft
E
LTG Aktiengesellschaft
⋅
Grenzstraße 7
⋅
D-70435 Stuttgart
⋅
+49 (0711) 8201-0
⋅
Fax -720
Internet: http://www.LTG-AG.de
⋅
E-Mail: [email protected]
⋅
Printed in Germany
⋅
Ausgaben mit früherem
Datum werden hiermit ungültig
⋅
Technische Änderungen vorbehalten
⋅
Former editions are invalid
⋅
Subject to technical modifications.
6.9
Maintenance Intervals of the Individual Components
Component
Activity
To perform
months
as required
Unit, in general
Check for pollution, damage, corrosion,
correct positioning and fixation
12
Filter
Check for pollution, damage and odours
3
Check the filter layer for tightness
3
Replace filter medium (document)
12*
x
Check for hygienic condition
3
Heat exchanger
Check for pollution, damage and corrosion
6
Clean to maintain function
6
x
Check water connections
12
Check proper function of entry and return
12
Vent
x
Check for hygienic condition
6
Dirt and
condensate tray
Check for pollution, damage, leak tightness
and corrosion
3
Clean to maintain function
x
Check for hygienic condition
3
Check heat insulation for damage (visual check)
x
Check drain and siphon for proper functioning
x
Fan
Check for pollution, damage, corrosion and proper
fixation
6
Clean to maintain function
x
Check impeller for imbalance
12
Check bearing for noises
12
Check vibration damper for proper functioning
12
Check safety device for proper functioning
12
Clean chambers from the inside
x
Check for hygienic condition
6
*Shorten replacement intervals if outside or recirculating air are extremely dust loaded.
VDI 6022 sanitation requirements must be observed.