Original Instructions for Installation, Use and Maintenance
Active Chilled Beam Type HDC
Section:
Page:
Date:
AG--B 213.1e
16
Feb. 2010
The Innovation Company
LTG Aktiengesellschaft
E
LTG Aktiengesellschaft
⋅
Grenzstraße 7
⋅
D-70435 Stuttgart
⋅
+49 (0711) 8201-0
⋅
Fax -720
Internet: http://www.LTG-AG.de
⋅
E-Mail: [email protected]
⋅
Printed in Germany
⋅
Ausgaben mit früherem
Datum werden hiermit ungültig
⋅
Technische Änderungen vorbehalten
⋅
Former editions are invalid
⋅
Subject to technical modifications.
4.
Installation
4.1
Notes
Shipping of Unit
If not required otherwise, units are shipped in wrapping boxes which may also serve as a protection during
installation. Boxes must be stored in an upright position as indicated by the arrow on the box. The packaging
is disposable and not to be returned to LTG.
Timing of Installation
Installation of the units should not be performed unless the prefabricated floor has been finished, the window
sill installed, the intermediate ceiling and any other dust producing work completed.
Handling of Units
Handle units with care during transport and installation. Avoid dropping to the ground.
4.2
Suspension
Please observe the following when installing air conditioning units:
- For reasons of stability and rigidity, never use bolts with a property class inferior to the one indicated. Fixing
elements are not included in the delivery.
- Do not use other than the holes provided for to fasten fixing elements.
- Do not use the air conditioning units as load--bearing elements for other components and avoid any other
loading.
Fixing elements must be chosen in a way to ensure that any sound transmis-
sion is avoided.