(2) Upper link installation and
adjustment
Select the suitable attaching hole(2) depending on
the implement.
Adjust the length of the upper link(1) using the
sleeve(4) after releasing the locking nut (3).
After the adjustment, fasten the locking nut (3).
Adjustment range : 400~ 50mm (15.7~29.5 in)
⑥
⑥
⑥
⑥
④
④
④
④
①
①
①
①
②
②
②
②
⑤
⑤
⑤
⑤
③
③
③
③
▶
To keep the upper link pin(5) from being lost, be sure to fix the snap pin(6).
Notice
(3) Adjustment of the lift rod’s
length (Left / Right)
For lift rod (LH), detach the upper side from the lift
arm and adjust the length by turning the upper side
(1).
-Adjustment range : 492~502mm (19.4~19.8 in)
For lift rod (RH), turn the handle to the right to
shorten the rod. If turning it to the left, the rod is
elongated. After adjustment, tighten the locking
nut(3).
- Adjustment range : 445~538mm (17.5~21.2 in)
When assembling lower link to upper hole of the lift
rod, it can additionally shorten the rod length by
63mm(2.5 in).
④
④
④
④
③
③
③
③
①
①
①
①
②
②
②
②
4
4
4
4
- 13
63mm(2.5 in).
(4) Adjustment of stabilizer’s length
①
①
①
①
Check chain type
Turn the grip(2) to adjust the length of the
stabilizer(1). After the adjustment , let it tightened
firmly by locking nut(3).
▶
When adjusting the stabilizer’s
length, adjust the implement’s
swinging clearance to be
20~40mm (0.79~1.57 in.) left
and right.
Notice
①
①
①
①
③
③
③
③
②
②
②
②