Safety

 

First 

 

A. 

SAFETY NOTES 

1. 

Check that all components are on site, undamaged and that they are functioning correctly – (refer to Checklist & Quantity 
Schedule). Damaged or incorrect components shall not be used. 

2. 

Before erecting the tower, check that the location for the mobile access tower does not present any hazards during erecting, 
dismantling, moving and safe working with respect to :- 

Ground conditions, and must be capable of supporting the weight of the structure. 
Level and slope   
Obstructions (ground and overhead) 
Wind conditions (current and potential). 

3. 

Check if the ground on which the mobile access tower is to be erected and moved is capable of supporting the tower. 

4. 

The mobile scaffold tower only be erected on a horizontal level surface. 

5. 

Lock all castors by pushing down brake levers. The brake levers may only be released for moving the mobile scaffold tower. 

6. 

The minimum of two competent persons are required to assemble and dismantle this mobile access tower. 

7. 

The safe working load is 

230

 kg per platform level, uniformly distributed up to a maximum of 

864

 kg per tower (including self 

weight). 

8. 

Tower 

must

 always be climbed from the inside using the build in ladder during assembly and use. 

9. 

It is recommended that towers should be tied to a solid structure when left unattended. 

10. 

Adjustable legs should only be used for leveling. 

11. 

DO NOT

 use boxes or ladders or others object on the platform to gain additional height. 

12. 

Never bridge between a tower and a building unless specification and approved. 

13. 

Do not brace yourself against the side guards when working. 

14. 

Never jump onto platforms. 

15. 

When possible, tie in the tower to a rigid structure when working outdoors or in exposed conditions.   

16. 

Beware of the funneling effect of open ended and unclad building. 

17. 

Debris netting or plastic sheeting should not be fixed to the tower without consulting your local branch. 

18. 

Raising and lowering components, tools, and/or materials by rope should be conducted within the tower base. Ensure that the 
safe working load of the supporting decks and the tower structure is not exceeded. 

19. 

Tools and materials may only be handed up, always taking the weight of the tools and materials into consideration so as not to 
overload the working platform. The person handing the load up may only release the load when the recipient of the load is 
holding securely in his hand. 

20. 

The assembled tower is a working platform and should not be used as a means of access to other structures. 

21. 

The maximum wind condition for moving the tower are Beaufort Scale 0-4 as described table (Page 4 Wind Speed Safety 
Rules) 

22. 

Beware of horizontal forces (lateral force) when using power tools, wash jet or other tools which could generate instability.

   

The Maximum horizontal force (lateral force) on a freestanding tower at platform level is 20kg. 

23. 

Mobile towers are not designed to be suspended-please refer to your supplier for advice. 

24. 

Do not use any lifting equipment on the mobile scaffold tower. 

25. 

Do not extend the platform height of the tower by the use of ladders, boxes or other devices.. 

26. 

Always beware of live electrical apparatus, cables or moving parts of machine 

27. 

Before each use or re-use of the mobile tower check the tower is vertical. Check with spirit level and adjust legs as need, the 
structure is still assembled correctly, and its complete. No environmental change have affected the tower (snow, wind, ice etc.); 
if so, correct as necessary before use. 

 

Summary of Contents for Trade King 730

Page 1: ......

Page 2: ...to ensure your system is erected easily and safely The law requires that personnel erecting towers must be competent and qualified to do so Any person erecting a Trade King 730 mobile tower should ha...

Page 3: ...e tie in the tower to a rigid structure when working outdoors or in exposed conditions 16 Beware of the funneling effect of open ended and unclad building 17 Debris netting or plastic sheeting should...

Page 4: ...th vehicles e g lift trucks Do not lift pull or push the mobile scaffold tower with a lift truck 3 When moving the tower always beware of any live electrical apparatus overhead cables or moving parts...

Page 5: ...t every 4 metres height 3 For further information on tying in a tower please contract your supplier G MAINTENANCE STORAGE TRANSPORT 1 All components and their parts should be regularly inspected to id...

Page 6: ...6 14 Trade King 730 Aluminium Scaffold Tower Components List 600...

Page 7: ...form height and a platform length of 1 55m has a self weight of 178kg 864 0kg 178 0kg 686 kg maximum safe working load Total weight self weight user tools and materials Example 2 A Trade King 730 towe...

Page 8: ...and 1 0m above platforms Never stand on an unguarded platform positioned above the first rung of a tower If your risk assessment shows it necessary you may also need to guardrail platform at this leve...

Page 9: ...to erection 3 Inspection tower prior to use 4 Tower upright and level 5 Castors locked and legs correctly adjusted 6 Diagonal braces fitted 7 Stabilisers outriggers fitted as specified 8 Platforms loc...

Page 10: ...base unit at the base of the tower Step 1 Set up the folded base stand pre assemble Step 3 Fit one horizontal brace RED onto the bottom rung 1st rung Step 4 Fit one diagonal braces BLUE in between the...

Page 11: ...r to horizontal as possible Step 8 Remove temporary platform from the lowest rung to the 6th rungs Step 9 Fit the temporary guardrails RED on the 8th and 10th rungs in that order on both sides of the...

Page 12: ...n the 13th and 16th rungs Step 15 Fit another one pair of diagonal braces BLUE in opposite direction between the 17th and 20th rungs Step 16 Remove temporary platform and the guardrails from the lowes...

Page 13: ...irection between the 21st and 24th rungs Step 21 Fit next one pair of diagonal braces BLUE in opposite direction between the 25th and 28th rungs Step 22 Fit one pair of 4 Rungs guardrail frames and ch...

Page 14: ...thin the trapdoor You may then unlock the securing hook at the ends of the guardrail to remove them from the tower Note For further information on this product or any other products and services pleas...