11 / 14
Assembly Procedure
ASSEMBLY FOR Trade King 730 Mobile Tower
Step 7.
Fit stabilisers to each corner of the mobile scaffold
tower to increase the effective base dimensions, as per the
plan view shown. To obtain the maximum extension of the
stabilisers the lower arm should be as near to horizontal as
possible.
Step 8.
Remove temporary platform from the lowest
rung to the
6th
rungs.
Step 9.
Fit the temporary guardrails (
RED
) on
the
8th
and
10th
rungs, in that order, on both
sides of the tower.
Step 10.
Fit one pair of diagonal braces (
BLUE
) in
opposite direction between the
9th
and
12th
rungs
Step 11.
Fit next one pair of 8 Rungs ladder frames
and check the frame interlock clips are engaged.
Step 12.
Fit one trapdoor platform on the
14th
rungs
and locked the securing hook.