Universal User Guide, Rev L, February 2022
26
If the TCM will be mounted on a floating dock, mount the meter towards the middle of dock to minimize
motion from waves and dock loading (Figure 3).
Figure 1A & 1B
: Recommended mounting method using dimensional lumber. A hole is
drilled through the end of the board with a second hole for the knot (left). The lanyard
length is limited to less than 25 mm (right).
25 mm
Max