Lovibond
®
PFX
i
Series Operator’s Instruction Manual V1.6
Page 42 of 53
Press Esc to exit or press
to accept the value and
return to the previous screen.
Follow the instructions shown on the display.
The First operation of the calibration is to perform a
baseline measurement. Ensure that the sample chamber is
empty and then press
ZERO
.
The progress of the baseline is shown on the progress bar
in the display.
Once the baseline measurement has completed, the
display will request a solution for measurement. The
solution Number will depend on the pack code.
Pour the solution into the measurement cell and place the
cell into the instrument; then press
READ
.
The progress of the measurement will be shown on the
progress bar in the display.
Each solution in the calibration pack will be requested in
turn and the measurement operation should be performed
for each solution. The used solution should be discarded
after use and not returned to the bottle.
When all the solutions have been measured, the measured
data is sent to the Calibration Server for verification.
When the measurements have been verified, the
Calibration Server will send a confirmation message back
to the instrument. An email containing the calibration
certificate will be sent to the email address registered on
the calibration site.
If the verification should fail, the Calibration Server will
send back information to the instrument display.