S35
Pre-Installation and Site Preparation Guide
1006705 Rev B
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
Page 45 of 52
Vertical up Through the Roof
Vent Stack Configurations
Cooling Stack
Hot Stack