Optional Equipment
(
for qualified installers only)
45
© Travis Industries
4/23/2021 - 1449
Radiant Large GSB2
8. Replace the regulator following the instructions included with the regulator kit. Remove and discard
the screws (see “a” below) holding the stock regulator in place (see “b” below). Remove the stock
regulator and gasket (see “c” below). Place the LP regulator in place, making sure the pre-fitted
gasket (see”c” below) is in place –
make sure it is correctly oriented
. Secure using the screws
included with the motor – tighten to 25 Lb-inches.
Leak test this area after installation to verify
proper installation.
There is a label on the base of the regulator knob indicating regulator type (NG
or LP). Place the included label on the valve body where it can be easily seen to insure proper
identification (“d”).
9. Replace the firebox components to restore the appliance to the correct configuration.
10. See the section “Steps for Finalizing the Installation” for instructions on starting the appliance and
verifying correct operation (remove glass, bleed gas line, leak test gas connections, start the heater,
inspect pilot flame, adjust air-shutter, and inspect burner performance). Verify gas output pressure
(manifold pressure) at this time (see the section “Gas Line Requirements” for details).