19
When the Hob is First Installed
Once the hob has been installed,
it is important to remove any
protective materials, which were
put on in the factory.
Any gas installation must
be carried out by a Gas Safe
Registered engineer.
The manufacturer will not
accept liability, should the above
instructions or any of the other
safety instructions incorporated in
this manual are ignored.
Gas Connection
Connection to the gas supply should be with a rigid pipe, i.e. steel or copper. The connection should be suitable
for connecting to 1/2 BSP male thread. When the final connection has been made, it is essential that a thorough
leak test is carried out on the hob and installation. Ensure that all pipework is not under any strain or stress.
1: End of manifold with 1/2 BSP male thread
2: Washer
3: 90 degree connection elbow
• All connections must be made by a
qualified Gas Safe engineer.
Min. 15mm
Min. 15mm
200 cm
2
* All images are for indication only; please refer to your individual unit for actual item.
Failure to ensure the correct
assembly will cause leakage of gas.
1
2
3
Min 15mm from hob base
If you are not fitting the hob
above an oven, you must install a
heat resistant barrier (minimum of
15mm below the hob) to separate
the hob from the cabinet.
Heat resistant barrier
LGHOBX16_IB.indd 19
11/07/2016 15:15