SMARTNEO-2G: CASCADING MANUAL // PAGE 7
6.6 Cascading System with three Actuators
16
6.6.1 Required Components
16
6.6.2 Connecting the Components
16
6.7 Cascading System with four Actuators
17
6.7.1 Required Components
17
6.7.2 Connecting the Components
17
7 Operation
18
7.1 Reference Drive
18
7.2 Factory Reset
18
7.2.1 With a Basic Hand Control
18
7.2.2 With a Comfort Hand Control
19
8 Troubleshooting
20
8.1 Lexicon
20
8.2 Possible Problems and their Solutions
20
9 Additional Information
21
9.1 Changing a Cascading System
21
9.1.1 Replacing a Control Box
21
9.1.2 Replacing an Actuator
21
9.1.3 Ungrouping a Cascading System
21
9.2 Maintenance
21
9.2.1 Disposal
21