19
11.0
COMMISSIONING AND TESTING
WATER CONNECTIONS
See
Section 8.6: WATER CONNECTIONS
The system should be thoroughly flushed out with cold water without any circulating pumps in position.
Ensure all the valves are open.
Check the system for leaks and repair as necessary. If the system is configured in a sealed arrangement, check the expansion
vessel cushion pressure and pressurisation unit settings.
TEMPERATURE ADJUSTMENT PROCEDURE
Once filled with water, and before use, or if the system has been drained down for a period of time, it is important to check the
operation of the valve
–
switch on the controller and set the temperature to a high level (temperature altered by raising the set point).
The actuator should slowly rotate until the valve is at the fully diverting position and then stop. Now lower the temperature (below
ambient), and the actuator should rotate anti-clockwise and stop at around the fully open position.
If the actuator does not move, or does not turn full travel, then switch off at the panel, the controller is not functioning correctly and
will need to be investigated further.
11.1.1
SETTING
/C
HANGING TEMPERATURE SET POINT
Ensure controller is plugged in or the junction box turned on if hard wired.
A= To change setpoint move joystick to either the left or right
B= Press joystick down to confirm new setpoint
11.1.2
SETTING
MIN/MAXIMUM
FLOW
TEMPERATURES
A=Press joystick and hold for five seconds
B=Choose menu Max or Min
C=Select OK
D=Adjust setting by scrolling with the joystick
C=Select OK
A=Press down joystick and hold for five seconds to return to main menu
Summary of Contents for LOKE8-100
Page 2: ...2 BLANK PAGE...
Page 16: ...16 Schematic LOKE instantaneous installation...
Page 17: ...17 Schematic LOKE with storage vessel schematic...
Page 23: ...23 12 7 1 EXAMPLES OF GASKET AND PLATE TYPES...
Page 25: ...25 14 0 DECLARATION OF CONFORMITY NOTES...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...