33
FIGURE 10.1
VENTED PIPEWORK ARRANGEMENT LBF81/121
FIGURE 10.2
VENTED PIPEWORK ARRANGEMENT LBF151 - 401
BUILDING
RETURN
IV
= ISOLATION VALVE
NRV = NON-RETURN VALVE
TPV = THREE PORT VALVE TO ATMOSPHERE
DV
= DRAIN VALVE
BRP = BUILDING RETURN PUMP
COLD SUPPLY
TO BUILDING
VENT
PIPE
BUILDING
FLOW
BUILDING
FLOW
PTRV
TD
IV
= ISOLATION VALVE
NRV
= NON-RETURN VALVE
TD
= TUNDISH
PTRV
= PRESSURE & TEMPERATURE RELIEF VALVE (OPTIONAL)
TPV
= THREE PORT VALVE TO ATMOSPHERE
DV
= DRAIN VALVE
BRP
= BUILDING RETURN PUMP
COLD SUPPLY
TO BUILDING
VENT
PIPE
IV
IV
BRP
BUILDING
RETURN
NRV
NRV
Summary of Contents for LBF121
Page 2: ......
Page 4: ......
Page 20: ...20 Fix the black flue hood casing to the heater using the screws supplied in the box ...
Page 52: ...52 ...