8-2
CHAPTER 8: TROUBLESHOOTING GUIDE
ECOLOAD S2
1. ALARMS
Please read the safety instructions provided at the beginning of this manual before
handling the following devices.
Particular attention should be given to the handling of electrical elements because of risks
of electrocution. In case of possible electrical malfunctions, it is advisable to contact LNS
or their local representative.
This chapter lists all the error messages description and brief troubleshooting. The error messages aim to
remind the operator that an abnormal situation probably exists. Whenever an error message activated,
please follow the description and troubleshooting guide to check the problem. If necessary, contact us for
technical support.
1.1. WARNING MESSAGES
Warning messages are designed to remind users the bar feeder status. Those messages are used to
remind operator the bar feeder working status. Under the following conditions, there will be a warning
message shown but Y04-alarm is not switched on.
Warning messages
Description
When the sensor SR1(0
˚
position) and sensor SR2(15
˚
position) are ON or OFF at the same time, alarm e16 will arise.
Press the STOP button on the remote control box and the
warning message will arise.
Trouble
shooting
1. Check SR1 and SR2 to see if the switches are broken.
2. Check if PLC input contact X03 and X04 or the connecting
line are broken.
3. Press the button
or
on the remote control box to
reset the status of channel.
Summary of Contents for Eco Load S2
Page 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Page 2: ......
Page 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Page 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Page 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Page 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Page 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Page 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Page 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Page 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Page 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Page 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Page 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Page 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Page 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Page 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Page 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Page 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Page 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...