P.20
Also refer to page
20 prior to work.
J-Connection
(1) Connect the front frames with front frame sleeves.
(2) Place the M/Y-connection ridgepoles on the position between front frames, and then fix them with
an M-connection fixing fitting for R and [14-1].
Work required for [J-Connection].
J-Connection
Work required for [J-Connection].
J-Connection
M/Y-Connection
Ridgepole
Connection Part
Front
Frame
Front
Frame
Sleeve
M-Connection Connecting
Fixing Fitting for R
M-Connection Connecting
Fixing Fitting for R
[14-1]
I
4 x 13
Pan Head Self Drilling Screw
[14-1]
I
4 x 13
Pan Head
Self Drilling Screw
(1) Seal the M-connection edge cap for R and
M/Y-connection ridgepole.
(2) Mount the M-connection edge cap for R
with [12-5].
(1) Mount the MY-connection cover for R to
the M/Y-connection ridgepole with [14-1].
(2) Seal the MY-connection cover for R.
[12-5]
I
4 x 20
Self-Tapping Truss Head Screw Class 2
M-Connection
Edge Cap for R
M/Y-Connection
Ridgepole
M/Y-Connection
Ridgepole
MY-Connection
Connection
Cover for R
Mounting for other than the
connection part is the same as
"For Independent Construction".
Tip
Sealing
Sealing
Sealing
For Connecting Construction
3
Mounting M-Connection Edge Caps
4
Mounting MY-Connection Covers
-23-