Work required for [J-Connection].
J-Connection
Tip
Add 400 to the height dimension.
[For Long Pillars]
This symbol indicates the
[Pillar Moving] range.
Warning
For [Pillar Moving],move the pillar
within ±100 mm of the pillar
core-to-core distance dimensions.
Pillar Moving
[About Foundation Dimensions]
Refer to "Page 7" for foundation dimensions "DW", "DL" and "DH".
P.7
L4
L1
L3
L3
L2
L2
W1
DL
Carport Main Unit Outer Line
DW
DW
DH
DL
Rear Frame Side
Front Frame Side
W2
H1
H2
H
W1
L1
L3
L2 [Pillar Core-to-Core]
100
100
100
100
Foundation
Concrete
Crushed Stones
GL
L4
L2 [Pillar Core-to-Core]
L3
90
100
100
100
100
Size (Length)
L1
L2
L3
L50 + 50
9922
2900
1040
Regular
L4
2042
A
706
Size (Width)
W1
H1
H2
W24
2400
2368
2164
W27
2701
2432 2228
W30
Regular
2999
W2
158
158
158
2576
2370
H
1796
1796
1796
Be sure to lay crushed stones so
that the water inside the pillars can
be drained.
Caution
A [Roof Rafter
Core-to-Core]
(1) Determine the embedding position for pillars
and then dig foundation holes.
Items to Check for J-Connection (L50)
Drawing
Marking Foundations
-17-