
35
62
Step 40:
Attach (1) Rail Board (039) to the Tower Legs (001) using (2) Screws (S119). Ensure the
predrilled hole is near the bottom edge of the Rail Board and that the Rail Board is
aligned with the previously installed Rail Boards (056).
Step 41:
Attach (1) Rail Board (006) to the Tower Legs (002) using (2) Screws (S119). Ensure that
the Rail Board is aligned with the previously installed Rail Boards (056).
Step 94:
Attach (5) Door Connect Boards (058) to the Door Support Board and Door Board
using (20) Screws (S91). Ensure that the Door Connect Boards are flush against the
Door Support.
Step 95:
Attach (1) Door Connect Board (059) to the Door Support Board and Door Board
using (4) Screws (S91). Ensure that the Door Connect Board is flush against the
previously installed Door Connect Board (058).