Pre-cut Value Gambrel - 4’ & 6’ Sidewalls
AssEmbLy InsTruCTIOn mAnuAL
17
Assembly Instruction Manual
© 2020 Little Cottage Co.
*Please Note: a 4’ sidewall uNit was used for Pictures showN*
90.
Continue with sheeting.
91.
Continue with the sheeting.
92.
Next install aluminum corners and secure with 2”
nails.
93.
For door installation, you will be using three hinges,
per side. Use one 2 1/2” blackheaded screw, per hinge.
Fill the remaining screw holes with 1 1/4” screws. This is
done for both sides.
94.
Fasten the hinges on the top, middle and bottom.
95.
Install the barrell bolt, using 1 1/4” screws, on the
inside of the left hand door (facing).