![LiteGear Inverter Power System Installation Instructions And User Manual Download Page 3](http://html1.mh-extra.com/html/litegear/inverter-power-system/inverter-power-system_installation-instructions-and-user-manual_1928074003.webp)
3
Table of Contents
Description
Page
100.
Installation ..................................................................................................................................................................... 4-5
100.1
General Installation Requirements
....................................................................................................................... 4
100.2 Cabinet Installation............................................................................................................................................................... 4
101.
AC Connections ............................................................................................................................................................ 5-6
101.1 General Precautionary Measures ........................................................................................................................................ 5
101.2 AC Wiring Preparations ........................................................................................................................................................ 6
101.3 AC Input Voltage Selection .................................................................................................................................................. 6
101.4 AC Output Voltage Selection ............................................................................................................................................... 6
101.5 AC Output Wattage Selection ............................................................................................................................................. 6
102.
Load Configuration Wiring Options ............................................................................................................................ 6-7
102.1 AC Input and AC Output Connections ................................................................................................................................. 6
102.2 "Normally ON" Loads .......................................................................................................................................................... 6
102.3 "Normally OFF" Loads ........................................................................................................................................................ 7
102.4 Externally Switched Loads .................................................................................................................................................. 7
103.
Installing the Batteries and DC Wiring ........................................................................................................................ 7-8
103.1 General Precautionary Measures ........................................................................................................................................ 7
103.2 Installation Considerations ................................................................................................................................................... 8
103.3 Battery Installation Procedure .............................................................................................................................................. 8
103.4 Electronics Cabinet Voltage Check ...................................................................................................................................... 8
104.
Final Installation Checklist .............................................................................................................................................. 9
104.1 Pre-Start-Up Systems Check ............................................................................................................................................... 9
105.
System Start-Up Procedure ............................................................................................................................................ 9
105.1 Sequence of Steps .............................................................................................................................................................. 9
105.2 Start-Up Procedure Steps .................................................................................................................................................... 9
106.
System Verification .......................................................................................................................................................... 9
106.1 Initial System Status ............................................................................................................................................................ 9
106.2 System Transfer Test ........................................................................................................................................................... 9
200.
Status Indicators .............................................................................................................................................................. 9
200.1 Indicators Provided .............................................................................................................................................................. 9
200.2 Unusual Circumstances ..................................................................................................................................................... 10
300.
Maintenance ............................................................................................................................................................... 10-12
300.1 General Precautionary Measures ...................................................................................................................................... 10
300.2 Final Shut Down Procedure ............................................................................................................................................... 10
300.3 Routine System Maintenance ............................................................................................................................................ 10
300.4 Manual Routine Inverter Tests ........................................................................................................................................... 10
300.5 Battery Maintenance and Replacement ............................................................................................................................ 10
300.6 Important Safety Precautions .............................................................................................................................................11
300.7 Routine Battery Inspection and Maintenance .....................................................................................................................11
300.8 Battery Replacement Procedure .........................................................................................................................................11
300.9 Battery Disposal ................................................................................................................................................................ 12
301.
Technical Service and Support ..................................................................................................................................... 12
301.1 Toll-Free Number ............................................................................................................................................................... 12
302.
Warranty Information ..................................................................................................................................................... 12
302.1 Warranty ............................................................................................................................................................................ 12