New Boiler Inspection

All Boilers are inspected and tested at the factory prior to shipment. On receipt of your new
boiler, be sure to check for any damage that may have occurred during shipping. Any such
damage should be reported to the carrier immediately.

Never install a damaged boiler.

Unpacking

The Boiler is shipped to you in one carton, which contains the boiler, a pressure & temperature
gauge, pressure relief valve, air vent, outdoor temperature sensor, and fittings.

System Design

For proper operation of the heating system, the boiler, the radiation system, and maximum
heat loss of the building must be considered. The boiler selected should provide between 110%
and 130% of the maximum design heat loss of the building. The radiation system should be
designed to properly dissipate the heating capacity of the boiler at the radiation system design
temperature.
The recommended cold fill pressure of the system is 12 psi; this pressure should leave at least 4
psi at the highest point in the heating system. Pressure will decrease at a rate of 0.433 psi per
foot above the fill point. An expansion tank must be included to allow for approximately 4%
expansion of the water in the entire heating system. As the water in the system is heated the
pressure will increase, but  a  properly  sized expansion  tank will  prevent the  pressure from
exceeding the recommended operating pressure.

The radiators or floor system should be designed with parallel loops. If too many radiators or
floor loops are connected in series, the accumulated heat loss may cause uneven heating. The
minimum recommended flow rate must be used, but higher flow rates may give more even
heating. If a number of parallel heating circuits are used, valves are usually required to balance
the flow in each circuit to provide uniform heating.

A   zoned   heating   system   is   also   possible   with   separate   heating   zones   and   individual
thermostats in each zone. Individual thermostats in each zone can control a zone valve, or a
circulation pump providing flow to that zone. End switches on the zone valves can be wired in
parallel to the thermostat connection of the boiler.

The entire heating system must comply with any local codes or regulations.

6

Summary of Contents for CEBR Series

Page 1: ...an appropriate antifreeze Do not use any other liquids especially methanol automotive antifreeze or any kind of oil Do not exceed 50 antifreeze LION BOILERS CEBR Series Boiler Installation Manual CEB...

Page 2: ...2...

Page 3: ...le phase power to terminals L1 and L2 and connection of a neutral conductor to the N terminal see Fig 4 Three phase models require connection of three phase power of the correct voltage to the L1 L2 a...

Page 4: ...he aquastat By modulating the boilers heat output based on both the indoor and outdoor temperature your CEBR model provides you with the ultimate in indoor comfort The graph below is an example with t...

Page 5: ...8 11 11 25 208 3 31 2 40 32 CEBR 208 15 14 7 208 3 40 8 60 48 CEBR 208 22 22 5 208 3 62 5 100 80 CEBR 208 30 29 4 208 3 81 6 125 100 CEBR 600 9 9 600 3 8 7 15 12 CEBR 600 15 14 7 600 3 14 1 20 16 CEBR...

Page 6: ...g system Pressure will decrease at a rate of 0 433 psi per foot above the fill point An expansion tank must be included to allow for approximately 4 expansion of the water in the entire heating system...

Page 7: ...r the boiler 3 Though the unit is suitable for floor or wall mount only faces indicated as Zero Clearance may be mounted against combustible surfaces 4 Units must be mounted straight as shown in Fig 2...

Page 8: ...block lower right terminal block see Fig 4 and Fig 5 The pump starts when the thermostat terminals on the control board are closed and stops when these terminals are opened If desired the pump may be...

Page 9: ...on pump and not the boiler the anticipator should be set to match the current draw of the zone valve being used Temperature Control Setting The boiler has a temperature control knob know as an aquasta...

Page 10: ...and thoroughly purged of air The automatic air vent is to assist in removing air from the top of the tank to prevent elements from burning out It alone is not sufficient in removing air from the entir...

Page 11: ...cipator setting Check pump circulation Boiler operates continuously Check anticipator setting Boiler noisy Oversized pump Flow rate too high Flow rate too low Pump location incorrect Boiler not heatin...

Page 12: ...that Boiler The obligation of the Manufacturer to repair replace or refund the purchase price exists provided the defective part or complete unit is returned to the Manufacturer ANY AND ALL TRANSPORT...

Page 13: ...ITNESS FOR A PARTICULAR PURPOSE ARE HEREBY DISCLAIMED AND EXCLUDED FROM THIS LIMITED WARRANTY THE MANUFACTURER S LIABILITY ON ANY CLAIM OF ANY KIND INCLUDING NEGLIGENCE WITH RESPECT TO THE GOODS OR SE...

Page 14: ...14...

Page 15: ...15...

Page 16: ...16...

Page 17: ...17...

Page 18: ...18...

Page 19: ...19...

Page 20: ...Check the fuse on models equipped with a fuse a Remove the fuse located inside the boiler Check it for continuity Replace with a new fuse of the correct type if necessary b Otherwise replace the exist...

Page 21: ...e sure the boiler and the heating system are completely full of water a Unplug the low water cut off from the control board Temporarily no more than one second place a jumper wire across the two pins...

Reviews: